Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Award Notice

Entry Point Switching Agreement

  • First published: 23 November 2023
  • Last modified: 23 November 2023
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-03efa4
Published by:
Premier Transmission Limited
Authority ID:
AA29883
Publication date:
23 November 2023
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Northern Ireland’s requirement for Entry Point Switching Services is being tendered by PTL for the period from 1st November 2023 until 30th September 2024 on behalf of GNI (UK), PTL, BGTL, & WTL (together the "Individual Transporters"). PTL is the owner and operator of the Scotland to Northern Ireland natural gas transmission pipeline ("SNIP"). This gas pipeline runs from Twynholm in Scotland across the Irish Sea, terminating at Ballylumford Power Station.BGTL is the owner and operator of the Belfast Gas Transmission Pipeline ("BGTP"). The BGTP runs from Ballylumford to offtakes at the Greater Belfast Distribution Zone. There is also an offtake at Middle Division near Carrickfergus feeding the North-West Pipeline. WTL is the owner of the Gas to the West pipeline ("WTP") which takes gas from the GNI (UK) Northwest Pipeline and delivers it to SGN’s distribution network which serves the towns of Strabane, Coalisland, Cookstown, Derrylin, Dungannon, Enniskillen, Magherafelt, Omagh and Strabane. The SNIP, BGTP and the WTP jointly form the Premier Transmission Pipeline System ("PTPS"). PTL, BGTL and WTL are owned by Mutual Energy Limited ("MEL"). GNI (UK) owns and operates two natural gas transmission pipelines in Northern Ireland. The North-West gas pipeline, from Carrickfergus to Londonderry, serves Coolkeeragh power station in Derry and enabled the development of gas networks along the route. The South-North gas pipeline runs from Gormanston, in County Meath, to Ballyclare, Co. Antrim, where it links into the North-West pipeline. There may be occasions when network conditions mean that it is difficult to flow the nominated quantity at the Moffat IP Entry Point into NI. To avoid declaring a System Constraint and/or in response to once occurring a Shipper may be instructed to renominate part or all of their entry requirements via the South North IP Entry Point instead of the Moffat IP Entry Point. The switching of flows to the alternative entry point will reduce the level of nominations at the Moffat IP Entry Point and reduce the risk of curtailing all Shippers.The requirement for any such action is determined by network conditions in accordance with the System Operator Agreement (SOA) and as agreed between PTL and GNI (UK) from time to time. As PTL operates the PTL, BGTL and WTL assets, it is party to these procedures on behalf of those operators.

Full notice text

Contract award notice – utilities

Section I: Contracting entity

I.1) Name and addresses

Premier Transmission Limited

1st Floor, The Arena Building, 85 Ormeau Road, Belfast, BT7 1SH

Belfast

BT7 1SH

UK

Contact person: Hannah Keery

Telephone: +44 2890437580

E-mail: Hannah.Keery@mutual-energy.com

NUTS: UKN

Internet address(es)

Main address: https://in-tendhost.co.uk/mutual-energy/aspx/Tenders/Current

Address of the buyer profile: https://www.mutual-energy.com/

I.6) Main activity

Production, transport and distribution of gas and heat

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Entry Point Switching Agreement

Reference number: 2023-PTL-00000015

II.1.2) Main CPV code

09123000

 

II.1.3) Type of contract

Supplies

II.1.4) Short description

Northern Ireland’s requirement for Entry Point Switching Services is being tendered by PTL for the period from 1st November 2023 until 30th September 2024 on behalf of GNI UK, PTL, BGTL, and WTL (together the "Individual Transporters").

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Lowest offer:   / Highest offer:  

II.2) Description

II.2.2) Additional CPV code(s)

09123000

II.2.3) Place of performance

NUTS code:

UKN


Main site or place of performance:

Ireland

II.2.4) Description of the procurement

Northern Ireland’s requirement for Entry Point Switching Services is being tendered by PTL for the period from 1st November 2023 until 30th September 2024 on behalf of GNI (UK), PTL, BGTL, & WTL (together the "Individual Transporters"). PTL is the owner and operator of the Scotland to Northern Ireland natural gas transmission pipeline ("SNIP"). This gas pipeline runs from Twynholm in Scotland across the Irish Sea, terminating at Ballylumford Power Station.BGTL is the owner and operator of the Belfast Gas Transmission Pipeline ("BGTP"). The BGTP runs from Ballylumford to offtakes at the Greater Belfast Distribution Zone. There is also an offtake at Middle Division near Carrickfergus feeding the North-West Pipeline. WTL is the owner of the Gas to the West pipeline ("WTP") which takes gas from the GNI (UK) Northwest Pipeline and delivers it to SGN’s distribution network which serves the towns of Strabane, Coalisland, Cookstown, Derrylin, Dungannon, Enniskillen, Magherafelt, Omagh and Strabane. The SNIP, BGTP and the WTP jointly form the Premier Transmission Pipeline System ("PTPS"). PTL, BGTL and WTL are owned by Mutual Energy Limited ("MEL"). GNI (UK) owns and operates two natural gas transmission pipelines in Northern Ireland. The North-West gas pipeline, from Carrickfergus to Londonderry, serves Coolkeeragh power station in Derry and enabled the development of gas networks along the route. The South-North gas pipeline runs from Gormanston, in County Meath, to Ballyclare, Co. Antrim, where it links into the North-West pipeline. There may be occasions when network conditions mean that it is difficult to flow the nominated quantity at the Moffat IP Entry Point into NI. To avoid declaring a System Constraint and/or in response to once occurring a Shipper may be instructed to renominate part or all of their entry requirements via the South North IP Entry Point instead of the Moffat IP Entry Point. The switching of flows to the alternative entry point will reduce the level of nominations at the Moffat IP Entry Point and reduce the risk of curtailing all Shippers.The requirement for any such action is determined by network conditions in accordance with the System Operator Agreement (SOA) and as agreed between PTL and GNI (UK) from time to time. As PTL operates the PTL, BGTL and WTL assets, it is party to these procedures on behalf of those operators.

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

II.2.14) Additional information

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: No

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2023/S 000-023770

Section V: Award of contract

Title: Entry Point Switching Agreement

A contract/lot is awarded: Yes

V.2 Award of contract

V.2.1) Date of conclusion of the contract

30/10/2023

V.2.2) Information about tenders

The contract has been awarded to a group of economic operators: No

V.2.3) Name and address of the contractor

Bord Gais Energy Limited

First Floor Building 6900, Avenue 6000, Cork Airport Business Park

Cork

T12 CFR6

IE

NUTS: IE

The contractor is an SME: No

V.2.5) Information about subcontracting

Section VI: Complementary information

VI.4) Procedures for review

VI.4.1) Review body

High Court Northern Ireland

Belfast

UK

VI.4.3) Review procedure

Precise information on deadline(s) for review procedures:

VI.4.4) Service from which information about the review procedure may be obtained

High Court Northern Ireland

Belfast

UK

VI.5) Date of dispatch of this notice

21/11/2023

Coding

Commodity categories

ID Title Parent category
09123000 Natural gas Gaseous fuels

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
Hannah.Keery@mutual-energy.com
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.