Scope
Procurement description
This procurement process is being advertised and run by First Greater Western limited on its own behalf and on behalf of the successor operator of the rail passenger transport services in respect of Great Western Railway (GWR). That successor operator will be a public sector company, is expected to be a wholly owned subsidiary of DfT OLR Holdings Limited and will be ultimately owned by the Secretary of State for Transport. The date for transfer of the current operations to the successor operator is not yet confirmed. Where the transfer is completed before contract award under this procurement process, the successor operator may elect (but will not be obliged) to carry on with this procurement process in place of GWR, by taking on the role of contracting entity from the date of completion of the transfer (with this notice and all other procurement documents to be interpreted accordingly). Where the transfer is not yet completed by the time of contract award, contractual rights may be included in the contractual arrangements to enable transfer to the successor operator. Bidders should note that this procurement process (if ongoing), or any awarded contract, may be included in a transfer scheme made by the Secretary of State under section 12 of the Railways Act 2005, or the transfer may be effected outside of, or separate from, such a scheme.
If transfer takes place before the contract award the successor operator shall assume all the rights of the Client set out in this document. All references to the Client shall be deemed to refer to the successor operator for the purposes of this procurement and the successor operator shall be entitled to continue or terminate this procurement as if it was involved.
GWR is stablishing a Framework Agreement for the delivery of construction and infrastructure works across its property and depot estates. The framework will cover a broad range of project types including minor building works, refurbishments, renewals, upgrades, and new construction at stations, depots, and operational facilities.
The framework will be divided into three lots:
Lot 1 - Minor Works: General building, refurbishment, and maintenance.
Lot 2 - Stations Major Works: Station upgrade and construction projects.
Lot 3 - Depot Works: Building and infrastructure improvements at depot sites
The framework will operate for a period of 3 years with an optional 1-year extension (3 + 1 years) and will be structured as an open framework, allowing supplier refresh during its lifetime.
Works will be called off under adapted JCT contract forms (Minor Works, Intermediate with Contractor's Design, or Design & Build, as applicable) and will be awarded via mini-competitions.
All works must be delivered to the required safety, quality, and environmental standards, ensuring minimal disruption to operational sites and alignment with the contracting authority's sustainability objectives.
Is a framework being established?
Yes
Is this an open framework scheme?
Yes
Contract
GWR - Framework Agreement for Construction and Infrastructure Works (Minor, Major and Depot Projects)
ID: 1
Status: Pending
Related lots
1, 2, 3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Delivery regions
- UKI - London
- UKJ - South East (England)
- UKK - South West (England)
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
2
Status: Pending
Related lots
1
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Delivery regions
- UKI - London
- UKJ - South East (England)
- UKK - South West (England)
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
3
Status: Pending
Related lots
1, 2
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
4
Status: Pending
Related lots
1, 2
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
5
Status: Pending
Related lots
1, 2, 3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 30 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
6
Status: Pending
Related lots
1, 2
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
7
Status: Pending
Related lots
1, 2, 3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
8
Status: Pending
Related lots
1, 2, 3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
9
Status: Pending
Related lots
1
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
10
Status: Pending
Related lots
1, 3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
11
Status: Pending
Related lots
2, 3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
12
Status: Pending
Related lots
2, 3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
13
Status: Pending
Related lots
3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
14
Status: Pending
Related lots
3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
15
Status: Pending
Related lots
3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030
16
Status: Pending
Related lots
3
Date the contract will be signed (estimated)
30 November 2026, 23:59PM
Can this contract be extended?: Yes
Value
90000000 GBP Excluding VAT
108000000 GBP Including VAT
CPV classifications
- 45000000 - Construction work
- 50000000 - Repair and maintenance services
Is the total value above threshold?
Above threshold
Contract dates (estimated)
30 November 2026, 00:00AM to 29 November 2029, 23:59PM
Extension end date (if all the extensions are used): 29 November 2030