Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

UK4

PRO005166 - ORiW - Design and Integration Partner

  • First published: 07 November 2026
  • Last modified: 07 November 2026
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-07b5da
Published by:
United Utilities Water Limited
Authority ID:
AA76770
Publication date:
07 November 2026
Deadline date:
01 December 2026
Notice type:
UK4
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

This notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms and chemicals. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. This Scope of Requirements does not include agricultural impacts; these are being considered by other programmes. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. • Reduced weather dependent flow, surface water management and management and treatment of highways runoff through the use of nature- based solutions where possible across the catchment. • Construction of tunnel, sewers, rising mains and associated infrastructure. • Upgrade of an existing wastewater treatment works and discharge point. UU anticipates that the ORiW system and the other strategic wastewater transfer and treatment infrastructure required for the ORiW programme (including the tunnel, rising mains, pumping stations, wastewater treatment facilities, associated drainage works and all ancillary infrastructure), will be promoted through a Development Consent Order (DCO) as a Nationally Significant Infrastructure Project (NSIP), subject to Section 35 approval by Defra. [SM1.1][WD1.2] UU are launching a competitive tendering procedure for the appointment of a Design and Integration Partner (D&IP) who will be responsible for supporting the next phase of this programme, designing the ORiW system, including whole system integration, to achieve the programme vision. UU requires the D&IP to complete feasibility, outline design, constructability and other related activities to obtain the necessary approvals and consents for the programme to proceed to the delivery phase for the preferred solution. Accordingly, the D&IP will also be responsible for the delivery of the DCO and planning approvals. As such, the outline design needs to fully support and integrate with the DCO, Town and Country Planning Act (TCPA) and land acquisition and access processes. At a high level, the initial scope of requirements for the D&IP will include, but may not be limited to the following activities across each of the workstreams of the ORiW system; • Outline Design • Planning, Consents and Land • Environmental Impact Assessments (EIA) and surveys • Stakeholder and Customer Engagement • Land Agency, Referencing and Surveying • Preparation and submission of planning applications and all supporting informatio

Full notice text

Changes to notice

Description

The previous notice stated that the maximum number of suppliers on the framework will be unlimited. To clarify, the maximum number of suppliers will be one. UU will award the framework to a single Design and Integration Partner (D&IP).

Scope

Procurement reference

PRO005166

Procurement description

This notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms and chemicals. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. This Scope of Requirements does not include agricultural impacts; these are being considered by other programmes. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. • Reduced weather dependent flow, surface water management and management and treatment of highways runoff through the use of nature- based solutions where possible across the catchment. • Construction of tunnel, sewers, rising mains and associated infrastructure. • Upgrade of an existing wastewater treatment works and discharge point. UU anticipates that the ORiW system and the other strategic wastewater transfer and treatment infrastructure required for the ORiW programme (including the tunnel, rising mains, pumping stations, wastewater treatment facilities, associated drainage works and all ancillary infrastructure), will be promoted through a Development Consent Order (DCO) as a Nationally Significant Infrastructure Project (NSIP), subject to Section 35 approval by Defra. [SM1.1][WD1.2] UU are launching a competitive tendering procedure for the appointment of a Design and Integration Partner (D&IP) who will be responsible for supporting the next phase of this programme, designing the ORiW system, including whole system integration, to achieve the programme vision. UU requires the D&IP to complete feasibility, outline design, constructability and other related activities to obtain the necessary approvals and consents for the programme to proceed to the delivery phase for the preferred solution. Accordingly, the D&IP will also be responsible for the delivery of the DCO and planning approvals. As such, the outline design needs to fully support and integrate with the DCO, Town and Country Planning Act (TCPA) and land acquisition and access processes. At a high level, the initial scope of requirements for the D&IP will include, but may not be limited to the following activities across each of the workstreams of the ORiW system; • Outline Design • Planning, Consents and Land • Environmental Impact Assessments (EIA) and surveys • Stakeholder and Customer Engagement • Land Agency, Referencing and Surveying • Preparation and submission of planning applications and all supporting information • Preparation and submission of the DCO and all supporting information • Site Investigation (SI) • Early Contractor involvement (ECI) • Supporting UU in meeting reporting requirements with Ofwat i.e. PR29 Price Review • Supporting UU with any required preparation, development and submission of information for the Water Industry National Environment Programme (WINEP) and Drainage and Wastewater Management Plan (DWMP) UU require a D&IP who has the capability and experience to ensure coordination over integration of all elements of the ORiW system and all other related activities that are required. The D&IP will also need to be capable of leading the overall delivery strategy, managing interfaces across the programme, maintaining design consistency, and ensuring that the complete solution meets the requirements to obtain the necessary approvals and consents. UU is continuing to consider its approach to the delivery phase of the programme and anticipates that it may need ongoing support from the D&IP into the delivery phase to provide continuity throughout the programme lifecycle. The precise form that this ongoing support may take will be dependent on the precise delivery model that UU adopt for the delivery phase, but the role to be played by the D&IP may include typical professional services support of the nature to be expected of a design and integration professional services consultant acting for a client in relation to the delivery phase of a major engineering and construction project, for example (without limitation) either: • The D&IP acting as system integrator and detailed design partner to either UU and/or any prime contractor engaged in relation to the programme. • The D&IP acting as a system integrator partner to provide support across different workstreams and work packages forming part of the programme so that the overall programme is delivered as seamlessly as possible. • Providing alternative services to support UU’s client-side management of delivery partners engaged to undertake the delivery phase of the programme. From a contractual perspective, this may entail: • Continuing consultancy services (e.g. oversight of delivery contractors or supporting the coordination between delivery contractors and/or developing the detail of design work undertaken during the development phase) provided by the D&IP on the same, or similar, call-off contract terms and conditions as are prescribed under the framework agreement for the development phase of the Programme; or • An evolution of the delivery model and associated call-off terms and conditions envisaged under the framework agreement for the development phase of the Programme to align to the Client’s proposed delivery model for the delivery phase of the Programme, including for example: o requiring the D&IP to enter into a strategic sub-contract with one or more delivery contractors appointed by the Client for the provision of detailed design services; or o the provision by the D&IP of design and integration services to the Client as part of an integrated “Enterprise” delivery model incorporating the Client, D&IP and delivery contractors and designed to create aligned incentives across all such participants. An outline of the potential structure and commercial proposition of this Enterprise model, including the call-off contract terms and conditions that could be used to effect it, will be set out in the framework agreement on an indicative basis (recognising that the precise terms and conditions of any call-off contract and the model more broadly would be developed separately by UU and refined through engagement with other potential Enterprise participants). Whatever model is adopted, the Client will ensure that the balance of risk and reward, and the potential commercial and financial impact on the D&IP, is similar and broadly equivalent to the balance struck in the call-off terms and conditions for the development phase. This means that UU will endeavour to ensure that, as and when any call-off terms and conditions are entered into, the D&IP would not be materially better off under the enterprise or alliance type model, in all material respects, compared to the position under a continuation of the development phase arrangements. Anticipated value of each role; • Design & Integration Partner (pre delivery phase) > 4 years = circa £60-100m • System Integrator Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa £100m (subject to CPIH) • System Integrator and Detailed Design Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa £500m (subject to CPIH) Please note that the total value is given as a range (£60m to £600m) which includes the minimum and maximum total estimated values across those roles. As explained above, the system integrator partner (during delivery phase) and system integrator and detailed design partner roles are alternatives and so the combined value of each is not included in the total (only the higher of the two).

Main category

Services

Delivery regions

  • UKD - North West (England)

Total value (estimated, excluding VAT)

600000000 GBP to 600000000GBP

Contract dates (estimated)

15 April 2027, 01:00AM to 14 April 2031, 23:59PM

Extension end date (if all the extensions are used): 14 April 2040

Is a framework being established?

Yes

Contracting authority

United Utilities Water Limited

Identification register:

  • GB-PPON

Address 1: Lingley Mere Business Park

Town/City: Warrington

Postcode: WA5 3LP

Country: United Kingdom

Website: https://www.unitedutilities.com

Public Procurement Organisation Number: PVVB-5589-BWHX

NUTS code: UKD61

Email: ORiWprocurement@uuplc.co.uk

Organisation type: Private utility

Procedure

Procedure type

Competitive flexible procedure

Is this procurement under a special regime?

Utilities

Is the total value above threshold?

Above threshold

Framework

Percentage fee charged to suppliers

0%

Maximum number of suppliers

1

Award method when using the framework

Without reopening competition

Framework operation description

Refer to tender documentation.

Lots

Divided into 1 lots

Lot number: LOT-0000

CPV classifications

  • 71320000 - Engineering design services
  • 45111250 - Ground investigation work
  • 70332100 - Land management services
  • 71242000 - Project and design preparation, estimation of costs
  • 71246000 - Determining and listing of quantities in construction
  • 71310000 - Consultative engineering and construction services
  • 71311000 - Civil engineering consultancy services
  • 71313400 - Environmental impact assessment for construction
  • 71313410 - Risk or hazard assessment for construction
  • 71313420 - Environmental standards for construction
  • 71313430 - Environmental indicators analysis for construction
  • 71313440 - Environmental Impact Assessment (EIA) services for construction
  • 71313450 - Environmental monitoring for construction
  • 71321100 - Construction economics services
  • 71322000 - Engineering design services for the construction of civil engineering works
  • 71322100 - Quantity surveying services for civil engineering works
  • 71322200 - Pipeline-design services
  • 71324000 - Quantity surveying services
  • 71333000 - Mechanical engineering services
  • 71334000 - Mechanical and electrical engineering services
  • 71351200 - Geological and geophysical consultancy services
  • 71351210 - Geophysical consultancy services
  • 71351500 - Ground investigation services
  • 71351720 - Geophysical surveys of archaeological sites
  • 71351810 - Topographical services
  • 71351811 - Topographical surveys of archaeological sites
  • 71351914 - Archaeological services
  • 71354500 - Marine survey services
  • 71420000 - Landscape architectural services
  • 71500000 - Construction-related services
  • 71530000 - Construction consultancy services
  • 71540000 - Construction management services
  • 71541000 - Construction project management services
  • 71800000 - Consulting services for water-supply and waste consultancy
  • 72224000 - Project management consultancy services
  • 72242000 - Design-modelling services
  • 77100000 - Agricultural services
  • 79415200 - Design consultancy services
  • 79420000 - Management-related services
  • 79930000 - Specialty design services
  • 90700000 - Environmental services
  • 90711400 - Environmental Impact Assessment (EIA) services other than for construction
  • 90712000 - Environmental planning

Delivery regions

  • UKD - North West (England)

Lot value (estimated)

600000000 GBP Excluding VAT

720000000 GBP Including VAT

Contract start date (estimated)

15 April 2027, 01:00AM

Contract end date (estimated)

14 April 2031, 23:59PM

Extension end date (estimated)

14 April 2040, 23:59PM

Can the contract be extended?

Yes

Description of extensions

Option to extend for up to a further 9 years in increments at UUs discretion.

Does the lot include options?

Yes

Description of options

Refer to Procurement description above.

Award criteria

Type: price

Name

Commercial

Weighting: 40

Weighting type: percentageExact

Type: quality

Name

Technical

Weighting: 60

Weighting type: percentageExact

Submission

Tender submission deadline

30 November 2026, 14:00PM

Enquiry deadline

17 November 2026, 14:00PM

Date of award of contract

01 April 2027, 23:59PM

Submission address and any special instructions

https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=109426&TID100114470&B=

May tenders be submitted electronically?

Yes

Languages that may be used for submission

  • English

Documents

ID

conflictOfInterest

Document type

Conflict of interest

Description

Not published

Coding

Commodity categories

ID Title Parent category
77100000 Agricultural services Agricultural, forestry, horticultural, aquacultural and apicultural services
71351914 Archaeological services Geological, geophysical and other scientific prospecting services
71311000 Civil engineering consultancy services Consultative engineering and construction services
71530000 Construction consultancy services Construction-related services
71321100 Construction economics services Engineering design services for mechanical and electrical installations for buildings
71540000 Construction management services Construction-related services
71541000 Construction project management services Construction management services
71500000 Construction-related services Architectural, construction, engineering and inspection services
71310000 Consultative engineering and construction services Engineering services
71800000 Consulting services for water-supply and waste consultancy Architectural, construction, engineering and inspection services
79415200 Design consultancy services Production management consultancy services
72242000 Design-modelling services Systems analysis and programming services
71246000 Determining and listing of quantities in construction Architectural, engineering and planning services
71320000 Engineering design services Engineering services
71322000 Engineering design services for the construction of civil engineering works Engineering design services
71313440 Environmental Impact Assessment (EIA) services for construction Environmental engineering consultancy services
90711400 Environmental Impact Assessment (EIA) services other than for construction Environmental impact assessment other than for construction
71313400 Environmental impact assessment for construction Environmental engineering consultancy services
71313430 Environmental indicators analysis for construction Environmental engineering consultancy services
71313450 Environmental monitoring for construction Environmental engineering consultancy services
90712000 Environmental planning Environmental management
90700000 Environmental services Sewage, refuse, cleaning and environmental services
71313420 Environmental standards for construction Environmental engineering consultancy services
71351200 Geological and geophysical consultancy services Geological, geophysical and other scientific prospecting services
71351210 Geophysical consultancy services Geological, geophysical and other scientific prospecting services
71351720 Geophysical surveys of archaeological sites Geological, geophysical and other scientific prospecting services
71351500 Ground investigation services Geological, geophysical and other scientific prospecting services
45111250 Ground investigation work Demolition, site preparation and clearance work
70332100 Land management services Non-residential property services
71420000 Landscape architectural services Urban planning and landscape architectural services
79420000 Management-related services Business and management consultancy and related services
71354500 Marine survey services Map-making services
71334000 Mechanical and electrical engineering services Miscellaneous engineering services
71333000 Mechanical engineering services Miscellaneous engineering services
71322200 Pipeline-design services Engineering design services for the construction of civil engineering works
71242000 Project and design preparation, estimation of costs Architectural, engineering and planning services
72224000 Project management consultancy services Systems and technical consultancy services
71324000 Quantity surveying services Engineering design services
71322100 Quantity surveying services for civil engineering works Engineering design services for the construction of civil engineering works
71313410 Risk or hazard assessment for construction Environmental engineering consultancy services
79930000 Specialty design services Miscellaneous business and business-related services
71351810 Topographical services Geological, geophysical and other scientific prospecting services
71351811 Topographical surveys of archaeological sites Geological, geophysical and other scientific prospecting services

Delivery locations

ID Description
There are no delivery locations for this notice.

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.