Procurement description
Tavistock Town Council as Client and Accountable Body invites tenders from consultants
with the relevant skills and capability to carry out an archaeological geophysical survey
Page 2 to 7
(CIfA standards) of the area shown on drawing J26.014. The method suggested and to be
priced for, due to the site conditions and project aims, is Ground Penetrating Radar
(GPR). Alternative methods, with associated rationale as an addition to the price schedule
will be accepted as part of the tender submission.
Due to the time sensitivities relating to the overall wider project deliverables, on
appointment, contractors are required to apply for the necessary consents to enable the
survey work to take place, which includes the Section 42 licence and production of the
accompanying method statement. When considering pricing the works and the drafting of
the method statement, the locations and associated activities need to be considered. e.g.
The site plan include a churchyard which has funerals and ceremonies, a highway/public
footpaths and a busy public realm (Bedford Square which has regular markets).
Allowance should be made when surveying the highway for unsociable hrs/traffic
management arrangements.
As part of the National Lottery Heritage Fund grant conditions, the project has
complimentary initiatives relating to community engagement. The appointed consultant
should allow when surveying the churchyard/or Bedford Square for two half days working
with community groups. (Note: this will include small groups, no more than 5 in No., either
from the Youth Café or Heritage community partners).
The contractor should allow for contacting sector specialists and statutory bodies as part
of a desk top exercise to ascertain what previous equivalent survey work exists which will
inform the works programme.
On completion of the survey work, the contractor will produce a written report which is
suitable to inform next steps with work commissioned to an appointed archaeologist,
regarding possible excavation works as well and being in a appropriate format for public
perusal as the results will feed into a wider interpretation programme, both digital and
physical. As a minimum the report should include: tile page, summary of results,
introduction, methods (techniques and methodologies), results, conclusions,
acknowledgements, statement of indemnity, references, appendices and associated plots
and plans, including interpretative plans/diagrams. These plans should be cross
referenced to Blaylock's plan of the Abbey.
The contractor must allow for the costs of data archiving, within 6 months of completion of
the report, including completing the online OASIS entry and depositing the digital archive
with the Archaeological Data Service.