Total quantity or scope of tender
Fencing
Approximately 900 m of timber fencing
Suitable fencing wire/netting and associated fittings are to be supplied and installed, compatible with the selected fencing system. And capable of excluding cattle.
Quote to include pricing for 25 x timber strainers (Number needed to be confirmed by the contractor).
Fence posts are to be positioned a minimum of 2 m from the riverbank.
The exact fence alignment will be agreed and marked on site by NWRT, the landowner and contractor prior to works commencing.
Supply and install 2 x 12 ft (3.66 m) galvanised steel agricultural access gates and padlocks at locations agreed with the landowner.
Supply and install 1 x pasture pump and associated timber structure to raise the pump and drinking bay off the ground.
Supply and install 2 x swing gates over the river to block access up and downstream from the crossing point.
Tree Planting
Supply and plant approximately 150 native trees within the newly established riparian buffer.
Planting should comprise a suitable mixture of native tree species, including:
Alder. 80x
Birch. 60x
Hazel. 30x
Oak. 30x
All planting stock must be sourced from biosecure UK nurseries.
Trees should be supplied as minimum 40–60 cm bare-root or cell-grown whips.
Biodegradable tree guards to be used.
Installation
Tree planting pattern and location to be confirmed on site with NWRT Project Officer.
Trees should be planted at approximately 2m intervals, with irregular spacing and small groups encouraged.
Alder should be concentrated in lower, wetter areas, with downy birch, oak, and hazel positioned on higher, better drained ground.
Each tree must be fitted with a minimum 1.2 m high tree guard and cane, suitable for protecting against browsing.
|