Voluntary ex ante transparency notice
Directive 2014/23/EU
Section I: Contracting
authority/entity
I.1) Name and addresses
London Borough of Havering
Town Hall, Main Road
Romford
RM1 3BD
UK
E-mail: Maria.Faheem@havering.gov.uk
NUTS: UKI52
Internet address(es)
Main address: www.havering.gov.uk
I.4) Type of the contracting authority
Regional or local authority
I.5) Main activity
General public services
Section II: Object
II.1) Scope of the procurement
II.1.1) Title
Havering Estate Regeneration Partner – Property/Asset JV Company
II.1.2) Main CPV code
45211340
II.1.3) Type of contract
Works
II.1.4) Short description
LB of Havering (‘the Council’) entered into a contract for up to 30 years for a partner to form a long-term corporate joint venture (‘JV’) property vehicle to secure investment and expertise to deliver Havering’s housing led regeneration strategy, entered into 27 April 2018 (‘the Contract’). The opportunity was advertised in OJEU (2017/S 094-185114) and procured under the Concession Contracts Regulations 2016. Further details of the original Contract are in that OJEU Notice. The Contract includes a Members’ Agreement (MA) and Development Agreement (DA) with the JV LLP and other ancillary documents.
The Council intends to make additional funding available, refresh the JV’s business plan and modify the DA.
Further information can be found in the Council’s supplement document, at the web address in section II.2.4) below.
The information in the supplement document should be read in conjunction with this notice and both documents should be considered as a whole.
II.1.6) Information about lots
This contract is divided into lots:
No
II.1.7) Total value of the procurement
Value excluding VAT:
1 177 000 000.00
GBP
II.2) Description
II.2.2) Additional CPV code(s)
45111000
45112700
45112710
45112711
45211300
45211341
45211350
45211360
45212000
45213100
45213112
45213150
45223300
65300000
70000000
70110000
70111000
70121100
70331000
70332200
71000000
71200000
71222000
71313400
71313420
71314200
71314300
71315200
71315300
71410000
71420000
71500000
71520000
71521000
73220000
79410000
79412000
79418000
90712100
II.2.3) Place of performance
NUTS code:
UKI52
Main site or place of performance:
The London Borough of Havering.
II.2.4) Description of the procurement
Further info is at https://www.havering.gov.uk/downloads/file/4215/appendix_3_veat_notice_supplement_document_-_havering_-_12_estates_renewal.
The Council intends to:
1) Make additional GBP 58.3 million equity funding available to JV. Also, to refresh JV business plan (BP) to include Council forward funding of GBP 45.4 million for phase 1 (in the light of additional 53 affordable housing units and reduction of open market units from 1085 to 934, changes to design and other factors).
2) Refresh JV BP to remove Delta estate.
3) Refresh JV BP to include addition of further sites.
4) Amend DA to bring forward timing of demolition of Waterloo Estate and Council providing additional £7.8m financing in place of debt funding (some changes to be made by variation to the DA and a new supplemental dev agreement with JV).
Continued in VI.3 (Additional Information).
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No
II.2.14) Additional information
Est value in II.1.7) and V.2.4) is projected value of proposed modified contract.
Section IV: Procedure
IV.1) Description
IV.1.1) Type of procedure
Award of a contract without prior publication of a call for competition
Justification for selected award procedure:
The procurement falls outside the scope of application of the Directive
Explanation:
Assessed individually and cumulatively, items 1–5 (as referred to in II.2.4) are all within the scope of the original OJEU/procurement and would not have affected the outcome (‘Procurement Outcome’).
The Council additionally/alternatively relies on Reg43(1)(a) (clear, precise, unequivocal review clauses), (c) (unforeeability), (e) (non substantial amendments — i.e. there is no material change in character of the contract, no considerable extension of scope, no distortion of competition and no change in the economic balance in favour of the contractor) and also Reg 31(6)(b)(ii) as further described below:
The forward funding described in Change 1 and also Changes 2 and 3 are part of the annual business plan refresh, are within procurement scope and do not result in a change to the Contract.
1) Re. additional equity funding: there is no increase in the Council’s peak net investment, no impact on the risk profile and no change in the economic balance. No change to the contract.
Re. forward funding: this is required due to a stagnant housing market eroding land value (impacting viability), build cost inflation, design enhancements, reduction in private sale cross subsidy and more affordable and family sized housing. These features would have applied to all bidders and the Council considers the Procurement Outcome would not have been impacted. Further, schedule 8, para 1.3 included scope to adjust Low Cost Unit Sum pursuant to VFM Standard and Code of Practice of Homes and Communities Agency.
2) Re. removal of the delta estate from current programme; this is a development phasing detail as no commitment was made to developing out the delta estate at this point in time, it was not tested as a sample scheme during the procurement process. Neither bidding behaviour nor Procurement Outcome would have been impacted.
3) Re. additional sites, these were within the OJEU notice scope and are similar to the sample sites tested as part of the procurement. Their delivery is consistent with financial and technical commitments in the tender to apply to subsequent schemes. The addition of further sites was transparently set out in the procurement documentation, is subject to an agreed mechanism and was incorporated into the evaluation questions. The Council alternatively relies on Reg 43(1)(a) (clear, precise, unequivocal review clauses).
Explanation continues in VI.4.3) Review procedure
IV.1.8) Information about Government Procurement Agreement (GPA)
The procurement is covered by the Government Procurement Agreement:
Yes
IV.2) Administrative information
IV.2.1) Previous publication concerning this procedure
Notice number in the OJ S:
2017/S 094-185114
Section V: Award of contract/concession
V.2 Award of contract/concession
V.2.1) Date of conclusion of the contract/concession
27/04/2018
V.2.2) Information about tenders
The contract has been awarded to a group of economic operators:
No
V.2.3) Name and address of the contractor
Wates Construction Ltd
Wates House, Station Approach
Leatherhead
KT22 7SW
UK
NUTS: UKJ2
Internet address(es)
URL: https://www.wates.co.uk/
The contractor is an SME:
No
V.2.4) Information on value of the concession and main financing terms (excluding VAT)
Initial estimated total value of the contract/lot/concession: 800 000 000.00 GBP
Total value of the concession/lot:
1 177 000 000.00
GBP
V.2.5) Information about subcontracting
The contract/concession is likely to be subcontracted
Section VI: Complementary information
VI.3) Additional information
Continued from II.2.4) (Description of the procurement):
5) Amend DA for Council to purchase all 197 units in Napier House and New Plymouth House development (‘NNP’). Refresh JV BP: payment for NNP will now be build contract sum approach (as opposed to fixed price per unit).
6) Amend DA so that development can commence in relation to the three Phase 1 sites (Napier and New Plymouth; Solar, Serena and Sunrise Courts and Waterloo Estates) to allow each site to be drawn down independently for development rather than together when site conditions have been meet for all three sites.
Council intends to refresh the BP, modify the DA, enter into funding agreements and a supplemental DA.
VI.4) Procedures for review
VI.4.1) Review body
Royal Courts of Justice
Strand, Holborn
London
WC2A 2LL
UK
VI.4.3) Review procedure
Precise information on deadline(s) for review procedures:
In accordance with Regulation 49-64 (Applications to the Court) of the Concession Contracts Regulations 2016 (‘CCR’).
Cont from Annex D4 (expl. for type of procedure) (Section IV.1.1.):
4: OJEU notice contained demolition CPV and DA included demolition obligations. Council considers that bringing forward demolition and GBP 7.8 million financing would not impact on Proc Outcome and is needed to expedite delivery and avoid additional costs. A change will be made to DA and a new supplemental DA entered into re. this item alone. The procurement of an alternative contractor would have legal and financial ramifications for Council, would stall the 12 Site Regeneration Programme and would not be a reasonable alternative. The Council therefore further relies on Reg 31(6)(b)(ii).
5: Re. purchase of units and payment for NNP, Council also relies on: Reg 43(1)(c) - both changes are reasonable and proportionate response to Covid (and needed to ensure the dev remains viable in current uncertain housing market). As per PPN01/20, changes are limited. The changes do not alter overall nature nor exceed original value by more than 50 %; Reg 43(1)(e) - NNP represents under 6 % of expected unit outputs. Re. build contract sum, the Council is accepting the risk of cost overruns, but any change will not be substantial and surveys provide assurance on this. No impact on Proc Outcome; Reg 43(1)(a) – contract stated price to be paid on Practical Completion but envisaged a change could be made if provided in BP or agreed between parties.
6. The DA links 3 Sites (Napier New Plymouth, Serena Sunrise and Waterloo Phase 1) into Stage 1 and requires that the pre-conditions be satisfied in relation to all 3 sites and that the sites be drawn down together for development. The DA is being varied to allow each of the Stage 1 Sites to be drawn down separately (in an order to be agreed between the parties) rather than all of Stage 1 having to be drawn down together. No impact on Proc Outcome Reg. 43(1)(e) in terms of the requirement to build out all 3 sites remaining in place and it is still proposed that they will be developed in close proximity in programme.
Further information can be found in the Council’s supplement document.
VI.5) Date of dispatch of this notice
15/10/2020