Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

UK4

ITT - Swindon Archive Decarbonisation Design Team (UID 320)

  • First published: 10 October 2026
  • Last modified: 10 October 2026
  • Version: N/A
  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Information icon
You are viewing an expired notice.

Contents

Summary

OCID:
ocds-h6vhtk-078534
Published by:
Historic England
Authority ID:
AA37908
Publication date:
10 October 2026
Deadline date:
04 November 2026
Notice type:
UK4
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3). The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind.The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity.A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care.Based on the information provided, Historic England's preferred option currently involves:• Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions.• Rationalisation of archive environmental zones to improve operational efficiency.• Fabric improvements to enhance thermal performance and airtightness.• Fire safety upgrades and associated building works.• Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth.Scope of ServicesThe appointed design team will be required to lead the project through:RIBA Stage 3 – Spatial CoordinationIncluding but not limited to:• Review and validation of the completed RIBA Stage 2 outputs.• Development of the preferred design solution.• Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions.• Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations.• Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design.• Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios.• Planning application preparation and submission.• Cost planning and value management exercises.• Development of a robust whole-life cost and carbon assessment.• Stakeholder engagement and workshop facilitation.• Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.

Full notice text

Scope

Procurement reference

P/REF 00000632

Procurement description

Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3).

The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind.

The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity.

A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care.

Based on the information provided, Historic England's preferred option currently involves:

• Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions.

• Rationalisation of archive environmental zones to improve operational efficiency.

• Fabric improvements to enhance thermal performance and airtightness.

• Fire safety upgrades and associated building works.

• Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth.

Scope of Services

The appointed design team will be required to lead the project through:

RIBA Stage 3 – Spatial Coordination

Including but not limited to:

• Review and validation of the completed RIBA Stage 2 outputs.

• Development of the preferred design solution.

• Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions.

• Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations.

• Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design.

• Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios.

• Planning application preparation and submission.

• Cost planning and value management exercises.

• Development of a robust whole-life cost and carbon assessment.

• Stakeholder engagement and workshop facilitation.

• Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.

Main category

Services

Total value (estimated, excluding VAT)

149000 GBP to 149000GBP

Contract dates (estimated)

28 January 2027, 00:00AM to 30 September 2027, 23:59PM

Extension end date (if all the extensions are used): 30 August 2028

Contracting authority

Historic England

Identification register:

  • GB-PPON

Address 1: The Engine House

Town/City: Swindon

Postcode: SN22EH

Country: United Kingdom

Public Procurement Organisation Number: PXLY-5862-RMML

NUTS code: UKK14

Email: procurement-he@historicengland.org.uk

Organisation type: Public authority - central government

Procedure

Procedure type

Competitive flexible procedure

Is the total value above threshold?

Above threshold

Lots

Divided into 1 lots

Lot number: 1

CPV classifications

  • 45262640 - Environmental improvement works
  • 71200000 - Architectural and related services
  • 71220000 - Architectural design services
  • 71240000 - Architectural, engineering and planning services
  • 71242000 - Project and design preparation, estimation of costs
  • 71313000 - Environmental engineering consultancy services
  • 71320000 - Engineering design services

Lot value (estimated)

149000 AED Excluding VAT

178000 AED Including VAT

Contract start date (estimated)

28 January 2027, 00:00AM

Contract end date (estimated)

30 September 2027, 23:59PM

Extension end date (estimated)

30 August 2028, 23:59PM

Can the contract be extended?

Yes

Description of extensions

RIBA stage 4 - we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3).

Award criteria

Type: price

Name

Pricing

Description

RIBA Stage 3 fixed price schedule

RIBA Stage 3 Rate table

RIBA Stage 4 Rate table

Weighting: 30

Weighting type: percentageExact

Type: quality

Name

Quality

Description

Quality 1 - Understanding of Project Objectives and Option Review Approach

Quality 2 - Methodology for Option Validation, Design Development and Technical Delivery

Quality 3 - Understanding of Archive Collection Requirements

Quality 4 - Archive Collections and Environmental Risk Management

Quality 5 - Relevant Experience and Lessons Learned

Quality 6 - Cost Management and Buildability

Quality 7 - Project Team and Resource Commitment

Social Value 1 - Environmental stewardship, skills and wider benefit

Weighting: 70

Weighting type: percentageExact

Submission

Expression of interest deadline

04 November 2026, 09:30AM

Enquiry deadline

28 October 2026, 17:00PM

Date of award of contract

12 January 2027, 23:59PM

Submission address and any special instructions

Please find further details of the project and submit any questions / submit your response to the procurement specific questionnaire (conditions of participation) via our free procurement portal : https://supplier.in-tend.co.uk/historicengland/home Please be aware at this Stage 1 (procurement specific questionnaire (conditions of participation)), we do not require a Tender returned. Only the stage 1 document.

May tenders be submitted electronically?

Yes

Languages that may be used for submission

  • English

Documents

ID

conflictOfInterest

Document type

Conflict of interest

Description

Not published

Coding

Commodity categories

ID Title Parent category
71200000 Architectural and related services Architectural, construction, engineering and inspection services
71220000 Architectural design services Architectural and related services
71240000 Architectural, engineering and planning services Architectural and related services
71320000 Engineering design services Engineering services
71313000 Environmental engineering consultancy services Consultative engineering and construction services
45262640 Environmental improvement works Special trade construction works other than roof works
71242000 Project and design preparation, estimation of costs Architectural, engineering and planning services

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.