Total quantity or scope of tender
Scope of Works
The successful contractor will be required to supply, install, and commission:
Solar Photovoltaic (PV) system
Battery energy storage system
Hybrid Inverter three-phase for PV, battery and grid management
Air-to-air heat pump system for office space heating
Wall-mounted internal fan-coil units with WLAN control
Unvented, hot water cylinders
Electric immersion heaters for PV and battery-powered water heating
Upgraded mains water supply to cottages
Secondary hot water circulation controls (timers and pipe thermostat)
LED energy efficient luminaires and motion activated sensors in multiple locations
System integration, training, and handover for hall committee members.
Technical Requirements
PV system should provide an annual generation of at least 20,000 kWh, with optimised panel configuration to minimise shading impact.
Battery storage to allow peak shaving and off-peak charging.
Level 3 Award in the Design, Installation and Commissioning of Electrical Energy Storage Systems
All heating and hot water systems must be compliant with current UK energy efficiency standards.
LED lighting must meet UK energy efficiency legislation and reduce CO₂ emissions by at least 75% compared with current fittings and have a smart control system.
Installations must be certified to the relevant BS7671 Wiring Regulation, MCS, NICEIC, or equivalent standards.
Deliverables
Full design, installation, and commissioning of all systems.
User training and system manuals.
Testing, certification, and compliance documentation.
Handover and warranty documentation.
IBG (Insurance Backed Warranty) minimum of 5 years
MCS Certification
G98 Notification
Clear communication and reassurance to the local community, including willingness to explain the system post-installation and provide prompt aftercare and advice (even for small issues).
|