Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Notice

The Supply of Project Management and Design Services for the Cell Therapy Catapult Manufacturing Cen

  • First published: 02 September 2014
  • Last modified: 02 September 2014
  • Version: N/A
  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Information icon
You are viewing an expired notice.

Contents

Summary

OCID:
Published by:
Cell & Gene Therapy Catapult
Authority ID:
AA58950
Publication date:
02 September 2014
Deadline date:
29 September 2014
Notice type:
Contract Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The Cell Therapy Catapult has received government funding to establish a large scale Cell Therapy Manufacturing Centre in the UK. Currently, UK manufacturing is served by small academic centres that are designed to provide material for early stage clinical trials. There is currently no large-scale infrastructure in the UK that would enable the manufacture of cell therapies for late stage, phase III manufacturing and subsequently for in-market supply. The location of the centre is in the process of being selected and it is possible the centre will be a new build facility, or the retro fit of an existing building. The Centre will be located in an area capable of supplying the main European Centres via a robust supply chain within 18 hrs — 24 hrs of product manufacture, as this is a common current constraint on shelf life. This location will also position the facility to be able to supply the large potential Middle East and North African (MENA) markets.

The Cell Therapy Catapult intends to appoint a combined project management and design team to work with the CTC to deliver the proposed new Manufacturing Centre. The appointment will include both the detailed design of the new facility (this will either be on the basis of a conversion of an existing building or a bespoke new build) together with full project and cost management and Construction Design Management Co-ordinator services to ensure on time and on budget construction and qualification of the manufacturing centre facility (the Services). It is envisaged that the team will work closely with the CTC project team to prepare and submit a planning application for the new facility as early as possible. In addition, it is expected the team will work with the CTC to prepare the detailed specification and Employer's Requirements of the new facility and the preparation and evaluation of tender documentation for the appointment of a suitable Principal Contractor on the basis of an NEC3 form of contract.

The appointed project management and design team will be required to work with CTC and the CTC advisors to develop a detailed design and construction plan for the manufacturing centre from the initial pre-concept design that will be provided by CTC. The detailed design is likely to include architectural and interior design services, civil, structural, mechanical and electrical engineering services, and other relevant design and planning functions. The detailed design and construction plan must be completed in time for construction works to begin in the first half of 2015. It is expected that the detailed design will be completed by April 2015. Further details of the timescales will be provided in the ITT.

Full notice text

CONTRACT NOTICE – OFFICIAL JOURNAL

Section I: Contracting Authority

I.1)

Name, Address and Contact Point(s)


Cell Therapy Catapult

12th Floor, Guy's Tower, Great Maze Pond

London

SE1 9RT

UK



ojeu@ct.catapult.org.uk


http://catapult.org.uk/celltherapy


Checked box
Unchecked box
Checked box
Unchecked box
Checked box
Unchecked box

I.2)

Type of contracting Authority and Main Activity or Activities

Checked box
Private company limited by guarantee
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Unchecked box
Checked box
Cell Therapies
No

Section II: Object of the Contract

II.1)

Description

II.1.1)

Title attributed to the contract by the contracting authority

The Supply of Project Management and Design Services for the Cell Therapy Catapult Manufacturing Centre.

II.1.2(a))

Type of works contract

II.1.2(b))

Type of supplies contract

II.1.2(c))

Type of service contract

12

II.1.2)

Main site or location of works, place of delivery or performance

London.



II.1.3)

This notice involves

Checked box
Unchecked box
Unchecked box

II.1.4)

Information on framework agreement (if applicable)

Unchecked box
Unchecked box

Number of participants to the framework agreement envisaged

Duration of the framework agreement

Justification for a framework agreement the duration of which exceeds four years

Estimated total value of purchases for the entire duration of the framework agreement

Frequency and value of the contracts to be awarded

II.1.5)

Short description of the contract or purchase(s)

The Cell Therapy Catapult has received government funding to establish a large scale Cell Therapy Manufacturing Centre in the UK. Currently, UK manufacturing is served by small academic centres that are designed to provide material for early stage clinical trials. There is currently no large-scale infrastructure in the UK that would enable the manufacture of cell therapies for late stage, phase III manufacturing and subsequently for in-market supply. The location of the centre is in the process of being selected and it is possible the centre will be a new build facility, or the retro fit of an existing building. The Centre will be located in an area capable of supplying the main European Centres via a robust supply chain within 18 hrs — 24 hrs of product manufacture, as this is a common current constraint on shelf life. This location will also position the facility to be able to supply the large potential Middle East and North African (MENA) markets.

The Cell Therapy Catapult intends to appoint a combined project management and design team to work with the CTC to deliver the proposed new Manufacturing Centre. The appointment will include both the detailed design of the new facility (this will either be on the basis of a conversion of an existing building or a bespoke new build) together with full project and cost management and Construction Design Management Co-ordinator services to ensure on time and on budget construction and qualification of the manufacturing centre facility (the Services). It is envisaged that the team will work closely with the CTC project team to prepare and submit a planning application for the new facility as early as possible. In addition, it is expected the team will work with the CTC to prepare the detailed specification and Employer's Requirements of the new facility and the preparation and evaluation of tender documentation for the appointment of a suitable Principal Contractor on the basis of an NEC3 form of contract.

The appointed project management and design team will be required to work with CTC and the CTC advisors to develop a detailed design and construction plan for the manufacturing centre from the initial pre-concept design that will be provided by CTC. The detailed design is likely to include architectural and interior design services, civil, structural, mechanical and electrical engineering services, and other relevant design and planning functions. The detailed design and construction plan must be completed in time for construction works to begin in the first half of 2015. It is expected that the detailed design will be completed by April 2015. Further details of the timescales will be provided in the ITT.

II.1.6)

Common Procurement Vocabulary (CPV)

79930000
71541000
79415200
71323200
71323000
71242000
71320000
22314000

II.1.7)

Contract covered by the Government Procurement Agreement (GPA)

Unchecked box

II.1.8)

Division into lots

No

II.1.9)

Will variants be accepted

No

II.2)

Quantity or Scope of the Contract

II.2.1)

Total quantity or scope

Details will be provided within the pre-qualification questionnaire (PQQ) and, to those that qualify, in the invitation to tender documents.

1 200 0002 000 000
GBP

II.2.2)

Options

Provisional timetable for recourse to these options

Number of possible renewals

In the case of renewable supplies or service contracts, estimated time frame for subsequent contracts

II.3)

Duration of the contract or limit for completion

24

Section III: Legal, Economic, Financial and Technical Information

III.1)

Conditions Relating to the Contract

III.1.1)

Deposits and guarantees required

The Catapult reserves the right to request guarantees and/or other forms of security. Details will be provided within the pre-qualification questionnaire (PQQ) and, to those that qualify, in the invitation to tender documents.

III.1.2)

Main Terms of financing and payment and/or reference to the relevant provisions

Details will be provided within the pre-qualification questionnaire (PQQ) and, to those that qualify, in the invitation to tender documents.

III.1.3)

Legal form to be taken by the grouping of suppliers, contractors or service providers to whom the contract is to be awarded

The Catapult reserves the right to require groupings of contractors to take a particular legal form or to require a single contractor to take primary liability or to require that each party undertakes joint and severable liability irrespective of the legal form of the contracting entity. Details will be provided in the pre-qualification questionnaire (PQQ) and the invitation to tender documents.

III.1.4)

Other particular conditions to which the performance of the contract is subject

The Catapult will require any organisation that is to be invited to tender for the services to have demonstrated that they:

a) are of sufficient financial standing; and

b) have sufficient experience, capacity, and capability;

in the management of the risks associated with delivery of the project.

Full details of the pre-qualification questionnaire and evaluation criteria are provided in the pre-qualification questionnaire (PQQ) and the invitation to tender documents.

III.2)

Conditions for Participation

III.2.1)

Personal situation of economic operators, including requirements relating to enrolment on professional or trade registers


The Authority will apply all the offences listed in Article 45(1) of Directive 2004/18/EC (implemented as Regulation 23(1) of the Public Contract Regulations (PCR) 2006 in the UK) and all of the professional misconducts listed at Article 45(2) of Directive 2004/18/EC (see also Regulation 23(2) in the PCR 2006) to the decision of whether a CandidateApplicant is eligible to be invited to tender.

Applicants will be required to answer these questions as part of the qualification process. For Applicants registered overseas, you will need to declare if you have any offences/misconduct under your own countries laws, where these laws are equivalent to the Regulation 23 lists. Applicants who have been convicted of any of the offences under Article 45(1) are ineligible and will not be selected to bid, unless there are overriding requirements in the general interest for doing so. Applicants who are guilty of any of the offences, circumstances or misconduct under Article 45(2) may be excluded from being selected to bid at the discretion of the Catapult.

III.2.2)

Economic and financial capacity


Selection information required from Applicants will be stated in the pre-qualification questionnaire (PQQ).



Applicant's annual turnover in each of the last 3 consecutive financial years is above GBP 2 500 000, or equivalent financial performance.


III.2.3)

Technical capacity


Applicants will be assessed in accordance with Part V of the Regulations, on the basis of information provided in response to the pre-qualification questionnaire. Completed response to pre-qualification questionnaires must be returned before the deadline for receipt of responses as notified in the pre-qualification questionnaire.



Applicants will be required to demonstrate that they will be able to comply with the minimum requirements set out in the policies and strategies of the Catapult, as set out and provided to the Applicant within the pre-qualification questionnaire; in respect of the Applicants technical ability to deliver the Catapult's requirements.


III.2.4)

Reserved contracts

Unchecked box
Unchecked box

III.3)

Conditions Specific to Service Contracts

III.3.1)

Is provision of the service reserved to a specific profession?

No

III.3.2)

Will legal entities be required to state the names and professional qualifications of the personnel responsible for the execution of the service?

No

Section IV: Procedure

IV.1)

Type of Procedure


Unchecked box Checked box
Unchecked box Unchecked box
Unchecked box Unchecked box

Justification for the choice of accelerated procedure

IV.1.1)

Have candidates already been selected?

No

IV.1.2)

Limitations on the number of operators who will be invited to tender or to participate

58

Objective criteria for choosing the limited number of candidates

Details will be provided within the pre-qualification questionnaire (PQQ).

IV.1.3)

Reduction of the number of operators during the negotiation or dialogue

Unchecked box

IV.2)

Award Criteria

No


Yes

No

IV.2.2)

An electronic auction will be used

No

IV.3 Administrative Information

IV.3.1)

Reference number attributed to the notice by the contracting authority

CON-0045

IV.3.2)

Previous publication(s) concerning the same contract

Unchecked box
Unchecked box


Other previous publications

IV.3.3)

Conditions for obtaining specifications and additional documents



 


IV.3.4)

Time-limit for receipt of tenders or requests to participate

 29-09-2014  10:00

IV.3.5)

Date of dispatch of invitations to tender or to participate to selected candidates


IV.3.6)

Language or languages in which tenders or requests to participate can be drawn up

Checked box    

IV.3.7)

Minimum time frame during which the tenderer must maintain the tender 

IV.3.8)

Conditions for opening tenders





Section VI: Other Information

VI.1)

Indicate whether this procurement is a recurrent one and the Estimated timing for further notices to be published


VI.2)

Does the contract relate to a Project/Programme financed by Community Funds?

No



VI.3)

Additional Information

To express interest in this opportunity and request a copy of the PQQ, please email ojeu@ct.catapult.org.uk

Completed PQQs must be returned to OJEU@ct.catapult.org.uk by the deadline of 10:00 am on 29.9.2014.

The Catapult reserves the right (acting in accordance with the Regulations) to:

— waive any requirements of this procurement process (to the extent permitted by law),

— request additional information or clarify information from Applicants in relation to any aspect of their response,

— disqualify any Applicant that does not submit a compliant response in accordance with the Catapult's instructions (see also below),

— withdraw any part of or the whole of this procurement process at any time or to re-invite responses on the same or any alternative basis,

— not award the whole of or a part of contract as a result of this procurement process; or,

— make whatever changes it sees fit to the timetable, structure or content of the procurement process for any reason.

Furthermore, the Catapult reserves the right (acting in accordance with the Regulations) to reject or disqualify an Applicant where:

— a response is submitted late, is completed incorrectly, is incomplete or fails to meet the Catapult's requirements which have been notified to Applicants,

— the Applicant is unable to satisfy the terms of Part V of the the Regulations at any stage during the procurement process,

— the Applicant is guilty of serious misrepresentation or fraud in relation to its application and/or any aspect of this procurement process,

— there is a change in identity, control, financial standing or other factor impacting on the ability and capacity of the Applicant to meet the Catapult's requirements for any of the Works, supplies, or services advertised; and/or,

— there is an actual or potential commercial, professional, financial or other conflict of interest arising between the interests of the Catapult and the Applicant.

The Applicant is solely responsible for all their costs and expenses incurred in connection with the preparation and submission of their responses at all stages of the procurement process. Under no circumstances will the Catapult be liable for any costs or expenses borne by or on behalf of any Applicant.

Clarifications and queries in respect of this Contract Notice or the pre-qualification questionnaire must be submitted in writing and via ojeu@ct.catapult.org.uk only. Direct emails, telephone calls or correspondence with the Cell Therapy Catapult will not be permitted during the procurement of this opportunity.

VI.4)

Procedures for appeal

VI.4.1)

Body responsible for appeal procedures


Cell Therapy Catapult





ojeu@ct.catapult.org.uk



Body responsible for mediation procedures


Cell Therapy Catapult





ojeu@ct.catapult.org.uk



VI.4.2)

Lodging of appeals

The Catapult will incorporate a mandatory 10 calendar day standstill periods at the point information on the award of the contract is communicated to tenderers. The Public Contracts Regulations 2009 (SI 2009 No. 2992) provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland). Where a contract has not been entered into, the Court may order the setting aside of the award decision or order the authority to amend any document and may award damages. If the contract has been entered into the Court may award damages or declare the contract ineffective. The purpose of the standstill period referred to above is to allow parties to apply to the Courts to set aside the award decision before the contract is entered into. The Catapult would urge aggrieved Tenderers to communicate any issues process by raising a Clarification Question through the ojeu@ct.catapult.org.uk in the first instance in case a solution can be found to avert time consuming actions involving the Courts.

VI.4.3)

Service from which information about the lodging of appeals may be obtained










VI.5)

Dispatch date of this Notice

 30-08-2014

Coding

Commodity categories

ID Title Parent category
71541000 Construction project management services Construction management services
79415200 Design consultancy services Production management consultancy services
22314000 Designs Postcards
71320000 Engineering design services Engineering services
71323000 Engineering-design services for industrial process and production Engineering design services
71323200 Plant engineering design services Engineering-design services for industrial process and production
71242000 Project and design preparation, estimation of costs Architectural, engineering and planning services
79930000 Specialty design services Miscellaneous business and business-related services

Delivery locations

ID Description
100 UK - All

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
ojeu@ct.catapult.org.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.