Description of the contract
The Council wishes to appoint a suitably qualified and experienced Engineering Consultant to undertake the design of highway and foul and surface water drainage for a new housing estate and preparation of all necessary documents to support a Planning Application to RIBA stage 3.
The site is located at King’s Road, Holyhead. A topographical survey of the site has been conducted and will be available in .dwg format upon request.
The focus of the design will be low carbon, affordable housing and the proposed design will need to conform to the standards set out in the Development Quality Requirements (DQR) Wales. It is intended that a social housing grant application be made to Welsh Government, so the design process will have to follow WG’s latest grant application procedure of concept and pre-planning approval stages. The client wishes for the new dwellings to utilise a MMC and achieve high energy efficiency standards.
The successful Consultant is to take the design to stage 3 of the RIBA Plan of Work 2020 and achieve full planning consent. Subsequent design work will be undertaken by the successful contractor on a design & build contract basis.
Tender documents may be accessed via the 'documents' tab on sell2wales
Questions and requests for clarification must be done via the sell2wales Q&A function.
Tenders must be submitted via the sell2wales postbox facility by 12:00pm on the 01/09/2021.
Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.
|