Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

UK6

Bass Rock Refurbishment 2025 - 2027

  • First published: 18 September 2025
  • Last modified: 18 September 2025
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-h6vhtk-051331
Published by:
Northern Lighthouse Board
Authority ID:
AA32832
Publication date:
18 September 2025
Deadline date:
-
Notice type:
UK6
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

We have a provision of refurbishment of Bass rock lighthouse. This lighthouse is situated on a steep crag on the southern entrance to the Firth of Forth off the east coast of Scotland. The island rises out of the sea to a height of 107 metres and it is about a mile in circumference. It is an important nesting ground for seabirds, including 40,000 gannets. The island is accessed from North Berwick by boat with a concrete path leading from the steps at the boat landings up to the lighthouse through the ruins of the Castle walls.We require a competent contractor to carry out the scope of works as below, these are initial requirements and they may be added to in the tender documents.Lighthouse Tower refurbishment - Painting, internal and external – full building externally, decoration internallyGlazing repairs – replacing window panes in light roomElectrical upgrades – installation of new light, batteries and solar arrayInstallation of HCL on roof domeSafety gates installed Asbestos testingFree issue equipment and detailed scope will be confirmed in the tender documents.External refurbishmentWinch house at side of lighthouse tower to be removed, asbestos present in the roofDrainage – courtyard drainage repairsWall removalMinor repairs to access landing and stepsBird guano removal Full details of the works will be given in the Tender documents. Contractors will need to confirm their competence in working at height, electrical works, and health and safety and environmental management. Due to nature Scotland restrictions in relation to bird nesting, access to Bass Rock for the works can only be between October and January every year. We expect these works to be carried out between these months in both 2025/26 and 2026/27. Access day to day will be by boat from the mainland, to be arranged by the awarded contractor. There are no toilets, overnight or fresh running water facilities on this site. Due to these limited welfare facilities and the PPE required to work on site, the works need to be carried out on site to a maximum of 4 hours per day.We will require all interested contractors to attend a mandatory site visit on 16th July 2025. We expect the following PPE to be supplied by NLB for this site visit – boat suits, breathing apparatus, lifejackets, personal locator beacons (PLB), Manta helmets. Interested suppliers are to wear waterproof footwear and clothing.TimelineSet out below is the proposed procurement timetable. This is intended as a guide and, whilst the NLB does not intend to depart from the timetable, it reserves the right to do so at any time.Issue of Invitation to Tender - 3rd July 2025Site Visit - 16th July 2025Clarification deadline - 24th July 2025Tender return deadline - 6th August 2025Tender Award - Estimated by mid-end August 2025Tools and materials to Oban - By 10th October 2025Contract start - 21st October 2025To view this notice, please click here: https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=981019939

Full notice text

Scope

Procurement reference

ENPR/LBAS/2501

Procurement description

We have a provision of refurbishment of Bass rock lighthouse. This lighthouse is situated on a steep crag on the southern entrance to the Firth of Forth off the east coast of Scotland. The island rises out of the sea to a height of 107 metres and it is about a mile in circumference. It is an important nesting ground for seabirds, including 40,000 gannets. The island is accessed from North Berwick by boat with a concrete path leading from the steps at the boat landings up to the lighthouse through the ruins of the Castle walls.

We require a competent contractor to carry out the scope of works as below, these are initial requirements and they may be added to in the tender documents.

Lighthouse Tower refurbishment -

Painting, internal and external – full building externally, decoration internally

Glazing repairs – replacing window panes in light room

Electrical upgrades – installation of new light, batteries and solar array

Installation of HCL on roof dome

Safety gates installed

Asbestos testing

Free issue equipment and detailed scope will be confirmed in the tender documents.

External refurbishment

Winch house at side of lighthouse tower to be removed, asbestos present in the roof

Drainage – courtyard drainage repairs

Wall removal

Minor repairs to access landing and steps

Bird guano removal

Full details of the works will be given in the Tender documents. Contractors will need to confirm their competence in working at height, electrical works, and health and safety and environmental management.

Due to nature Scotland restrictions in relation to bird nesting, access to Bass Rock for the works can only be between October and January every year. We expect these works to be carried out between these months in both 2025/26 and 2026/27. Access day to day will be by boat from the mainland, to be arranged by the awarded contractor. There are no toilets, overnight or fresh running water facilities on this site. Due to these limited welfare facilities and the PPE required to work on site, the works need to be carried out on site to a maximum of 4 hours per day.

We will require all interested contractors to attend a mandatory site visit on 16th July 2025. We expect the following PPE to be supplied by NLB for this site visit – boat suits, breathing apparatus, lifejackets, personal locator beacons (PLB), Manta helmets. Interested suppliers are to wear waterproof footwear and clothing.

Timeline

Set out below is the proposed procurement timetable. This is intended as a guide and, whilst the NLB does not intend to depart from the timetable, it reserves the right to do so at any time.

Issue of Invitation to Tender - 3rd July 2025

Site Visit - 16th July 2025

Clarification deadline - 24th July 2025

Tender return deadline - 6th August 2025

Tender Award - Estimated by mid-end August 2025

Tools and materials to Oban - By 10th October 2025

Contract start - 21st October 2025

To view this notice, please click here:

https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=981019939

Contracting authority

Northern Lighthouse Board

Identification register:

  • GB-PPON

Address 1: 84 George Street

Town/City: Edinburgh

Postcode: EH2 3DA

Country: United Kingdom

Public Procurement Organisation Number: PMGV-7529-QWXG

NUTS code: UKM75

Contact name: Lindsey Wilkinson

Email: procurement@nlb.org.uk

Telephone: 0131 473 3131

Organisation type: Public authority - central government

Supplier

Accted Engineering

Address 1: Unit C22, Ashmount Enterprise Park,, Aber Road

Town/City: Flint

Postcode: CH6 5YL

Country: United Kingdom

NUTS code: UKL23

Contact name: Matthew Cooke

Email: matt@accted.co.uk

Telephone: 01244628975

Type:

  • SME

Procedure

Procedure type

Below threshold - open competition

Contract

1

Status: Pending

Related lots

ENPR/LBAS/2501

Date the contract will be signed (estimated)

18 September 2025, 23:59PM

Can this contract be extended?: Yes

Value

550000.00 GBP Excluding VAT

660000.00 GBP Including VAT

Main category

Works

CPV classifications

  • 45111240 - Ground-drainage work
  • 45111300 - Dismantling works
  • 45200000 - Works for complete or part construction and civil engineering work
  • 45262660 - Asbestos-removal work
  • 45311100 - Electrical wiring work
  • 45315100 - Electrical engineering installation works
  • 45440000 - Painting and glazing work
  • 45442110 - Painting work of buildings

Delivery regions

  • UKM7 - Eastern Scotland

Is the total value above threshold?

Below threshold

Contract dates (estimated)

19 September 2025, 00:00AM to 01 February 2027, 23:59PM

Extension end date (if all the extensions are used): 01 February 2028

Suppliers

  • GB-FTS-155187

Coding

Commodity categories

ID Title Parent category
45262660 Asbestos-removal work Special trade construction works other than roof works
45111300 Dismantling works Demolition, site preparation and clearance work
45315100 Electrical engineering installation works Electrical installation work of heating and other electrical building-equipment
45311100 Electrical wiring work Electrical wiring and fitting work
45111240 Ground-drainage work Demolition, site preparation and clearance work
45440000 Painting and glazing work Building completion work
45442110 Painting work of buildings Application work of protective coatings
45200000 Works for complete or part construction and civil engineering work Construction work

Delivery locations

ID Description
There are no delivery locations for this notice.

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.