Total quantity or scope of tender
The works will include but are not limited to:
• System Specification
o Minimum storage capacity: 100 kg hydrogen (at 30 bar or above).
o Above-ground storage (modular/composite or steel vessels).
o Rated to appropriate operating pressures.
o Pressure relief, safety valves, and gas detection integration.
o Fully certified to PED, ISO 19880, ISO 11114, ASME, or equivalent UK/EU standards.
o Design life: minimum 15 years.
• Installation & Commissioning
o Delivery and installation on prepared slab at Bay Studios site.
o Full connection to electrolyser and dispensing units.
o Commissioning, leak testing, and safety verification.
o Integration with site safety systems (fire detection, H2 sensors, emergency shut-off).
• Operational Requirements
o Remote monitoring capability (pressure, temperature, gas level).
o Compatible with high-pressure hydrogen compression and decanting.
o Flexibility to integrate into future hydrogen pipeline network.
• Documentation & Warranties
o Minimum 5-year warranty on tank and valves.
o Operations and Maintenance manual.
o Training for Hyppo staff.
o All CE/UKCA certification supplied.
If your proposal does not meet all of the requirements please get in touch as we will consider all options presented.
|