Engagement process description
ateb Group wishes to establish a framework with multiple Contractors to cover different workstreams for retrofit and decarbonisation works. This is a new framework for the organisation and planned to be live in April 2026.
SCALE, SCOPE AND NATURE OF REQUIREMENT
ateb Group intends to procure a new framework of service providers to carry out various retrofit and decarbonation works to assist in our journey to achieving net zero targets. The structure of the framework will be split into the suggested Lot’s shown below –
LOTS
1. Electrical, inc but not limited to:
• Electrical Safety Testing & Certification
• Electrical Installation Condition Reports (EICRs)
• PAT (Portable Appliance Testing)
• Testing of Communal Systems
• Electrical Upgrades & Renewals
• Rewiring
• Consumer Unit Replacement
• Smart Meter & EV Charger Installation
• Safety Systems
• Fire and CO Alarm Replacement
• Emergency Lighting Replacement
• Associated Communal Services
• CCTV & Door Entry Systems
• Automatic Gates and Barriers
• Communal Lighting
• Solar PV & Battery
2. Mechanical, inc but not limited to:
• Heating Systems (GSHP/ASHP)
• Hot and Cold Water Services
• Mechanical Ventilation
• Centralised Systems
• Renewable Energy
• Gas Supplies
• Statutory Inspections & Servicing
• Responsive & Planned Maintenance
3. Fabric, inc but limited to:
• External Fabric
• Walls
• Insulation
• Windows and Doors
4. Whole House, inc but not limited to:
Internal Works
• Kitchens and Bathrooms
• Electrical Systems
• Mechanical/Heating Systems: Plumbing
• Joinery
• Plastering and Tiling
• Flooring
External Works
• Roofing
• Windows and Doors
• Brickwork
• Landscaping
• Associated and Capital Works
• Energy Efficiency
• Fire Safety
5. M&E Consultants, inc but not limited to:
• Building Services Design
• Sustainability and Carbon Reduction
• Building Safety and Compliance
• Project Delivery
• Asset Management and Surveys
• Technical Documentation
• Principal Designer Services
• Retrofit and Modernisation
• Reporting and Collaboration
ateb Group intends to use the following specifications and priced on a SOR format of bidding for this framework
• M3NHF Net Zero Carbon Works v8 Volume 1 (d) Specification
• M3NHF Planned Works v8 Volume 1 (d) Specification
Contractor Engagement Day likely to held in November 2025 with invitations due to go out in October.