Contract Notice

A55 DBFO Traffic Management Contract Phases 10 and 9

  • First published: 25 April 2018
  • Last modified: 25 April 2018
  • Version: N/A
  • This file may not be fully accessible.

  •  

Information icon
You are viewing an expired notice.
Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-kuma6s-081253
Published by:
Cyngor Gwynedd
Authority ID:
AA0361
Publication date:
25 April 2018
Deadline date:
14 May 2018
Notice type:
Contract Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

1 The objective of the tendering process is to procure a Traffic Management Contractor to provide Traffic Management function to the Main Contractor works for Gwynedd Civil Engineering. 2 The Traffic Management subcontractor shall provide the following Traffic Management criteria for the following phases; •A55 Anglesey Phase 10 Carriageway Major Maintenance Crossing point locations at Marker Post (MP) Reference 23/8, length of Crossover 96m to MP 23/8+96 MP Ref. 17/8 +64 length of Crossover 96m to MP 17/9+60 N.B. All the following Marker Post References are approximate to the nearest Marker Post Limits of carriageway maintenance works approx. 23/8 at Eastern end and 17/9 at Western end. Slip road closure requirements – Junction 6 Nant Turnpike West and Eastbound on and off slip roads Junction 6 W/B start of off slip at MP Ref. 23/7 end of on slip at MP Ref. 22/5 Junction 6 E/B start of off slip at MP Ref. 22/6 end of on slip at MP Ref. 23/6 Overhead power lines at two locations, between MP Ref. 23/6 and MP Ref. 23/7 between MP Ref.19/7 and MP Ref. 19/8 • A55 Anglesey Phase 9 Carriageway Major Maintenance Crossing point locations at Marker Post (MP) Reference 10/2, length of Crossover 96m to MP 10/2+96 MP Ref. 14/4+25 length of Crossover 96m to MP 14/5+21 N.B. All the following Marker Post References are approximate to the nearest Marker Post Limits of carriageway maintenance works approx. 10/2+50 at Eastern end and 14/5 at Western end. Slip road closure requirements – Junction 5 A4080 West and Eastbound on and off slip roads Junction 5 E/B start of off slip at MP Ref. 13/3 end of on slip at MP Ref. 14/2 Junction 5 W/B start of off slip at MP Ref. 14/2 end of on slip at MP Ref. 13/3 Overhead power line at one location, between MP Ref. 13/6 and 13/7 3 The proposed works will be carried out in accordance with the terms and conditions set out in the NEC4 engineering and construction short subcontract.

Full notice text

CONTRACT NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


Gwynedd Council

Gwynedd Civil Engineering, Parc Diwydiannol Mona,

Gwalchmai

LL65 4RJ

UK

Gareth Vaughan Roberts

+44 1407721296


www.gwynedd.gov.uk
https://etenderwales.bravosolution.co.uk/
https://etenderwales.bravosolution.co.uk/

1.2

Address from which documentation may be obtained


Gwynedd Council

Corporate Procurement Unit,, Council Offices, Shire Hall Street,,

Caernarfon

LL55 1SH

UK


+44 1286679787


www.gwynedd.gov.uk

1.3

Completed documents must be returned to:


Gwynedd Council

Corporate Procurement Unit,, Council Offices, Shire Hall Street,,

Caernarfon

LL55 1SH

UK


+44 1286679787


www.gwynedd.gov.uk

2 Contract Details

2.1

Title

A55 DBFO Traffic Management Contract Phases 10 and 9

2.2

Description of the goods or services required

1 The objective of the tendering process is to procure a Traffic Management Contractor to provide Traffic Management function to the Main Contractor works for Gwynedd Civil Engineering.

2 The Traffic Management subcontractor shall provide the following Traffic Management criteria for the following phases;

•A55 Anglesey Phase 10 Carriageway Major Maintenance

Crossing point locations at Marker Post (MP) Reference 23/8, length of Crossover 96m to MP 23/8+96

MP Ref. 17/8 +64 length of Crossover 96m to MP 17/9+60

N.B. All the following Marker Post References are approximate to the nearest Marker Post

Limits of carriageway maintenance works approx. 23/8 at Eastern end and 17/9 at Western end.

Slip road closure requirements – Junction 6 Nant Turnpike West and Eastbound on and off slip roads

Junction 6 W/B start of off slip at MP Ref. 23/7 end of on slip at MP Ref. 22/5

Junction 6 E/B start of off slip at MP Ref. 22/6 end of on slip at MP Ref. 23/6

Overhead power lines at two locations, between MP Ref. 23/6 and MP Ref. 23/7 between MP Ref.19/7 and MP Ref. 19/8

• A55 Anglesey Phase 9 Carriageway Major Maintenance

Crossing point locations at Marker Post (MP) Reference 10/2, length of Crossover 96m to MP 10/2+96

MP Ref. 14/4+25 length of Crossover 96m to MP 14/5+21

N.B. All the following Marker Post References are approximate to the nearest Marker Post

Limits of carriageway maintenance works approx. 10/2+50 at Eastern end and 14/5 at Western end.

Slip road closure requirements – Junction 5 A4080 West and Eastbound on and off slip roads

Junction 5 E/B start of off slip at MP Ref. 13/3 end of on slip at MP Ref. 14/2

Junction 5 W/B start of off slip at MP Ref. 14/2 end of on slip at MP Ref. 13/3

Overhead power line at one location, between MP Ref. 13/6 and 13/7

3 The proposed works will be carried out in accordance with the terms and conditions set out in the NEC4 engineering and construction short subcontract.

NOTE: The authority is using eTenderwales to carry out this procurement process. To obtain further information record your interest on Sell2Wales at https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=81253

2.3

Notice Coding and Classification

45000000 Construction work
1011 Isle of Anglesey
1012 Gwynedd

2.4

Total quantity or scope of tender

Phase 10 –

Design of Traffic Management and submission of CAD TM Drawings for Phase 10, East and West Bound, by 21st May 2018, two weeks prior to start date

Mobilisation and demobilisation of plant and equipment

Installation, maintenance and removal of ‘WORK STARTS HERE’ (Bilingual – Welsh over English) sinage, including start dates and duration of the works

Installation, maintenance and removal of back to back, Lane 2 closures at crossover points 17/9 and 23/8 to facilitate opening and closing of Wire Rope Safety Fences (WRSF)

Removal, re-installation and

re-tensioning of WRSF at crossover points 17/9 and 23/8.

Traffic Safety Control Officer and vehicle (Rate per day shift 07.00 to 19.00)

Traffic Safety Control Officer and vehicle (Rate per night shift 19.00 to 07.00)

Sequence 1 - Works on A55 Anglesey West Bound Carriageway

Installation, maintenance and removal of Traffic Management for closure of Lay-by’s at Marker Post (MP) ref. 26/4 W/B (Abnormal Load holding area) MP ref. 20/2 E/B and MP ref. 18/2 E/B

(Include for lay-by ahead and lay-by closed signage)

Installation, maintenance and removal of Abnormal Load signage and bespoke signs for diversions

Installation, maintenance and removal of Traffic Management for closure of Junction 6 West Bound off and on slip roads, including diversion route signage and Junction 6 W/B, slip roads closure date signage.

Installation, maintenance and removal of Traffic Management APPROACH, LANE CHANGE, LEAD-IN and END zones, crossover arrangements at crossing points 17/9 and 23/8 and cylinder cones with buffer zone along centerline length of contraflow on East Bound carriageway.

Installation, maintenance and removal of 4 no. mobile tower lighting units. 2 no. at each crossover point location.

Sequence 2 - Works on A55 Anglesey East Bound Carriageway

Installation, maintenance and removal of Traffic Management for closure of Lay-by’s at Marker Post (MP) ref. 15/3 E/B (Abnormal Load holding area) MP ref. 18/2 W/B and MP ref.20/2 W/B

(Include for lay-by ahead and lay-by closed signage)

Installation, maintenance and removal of Abnormal Load signage and bespoke signs for diversions

Installation, maintenance and removal of Traffic Management for closure of Junction 6 East Bound off and on slip roads, including diversion route signage and Junction 6, E/B slip roads closure date signage.

Installation, maintenance and removal of Traffic Management APPROACH, LANE CHANGE, LEAD-IN and END zones, crossover arrangements at crossing points 17/9 and 23/8 and cylinder cones with buffer zone along centerline length of contraflow on West Bound carriageway.

Installation, maintenance and removal of 4 no. mobile tower lighting units.

2 no. at each crossover point location.

Phase 9 –

Design of Traffic Management and submission of CAD TM Drawings for Phase 9, West and East Bound by 3rd September, 2018, two weeks prior to start date

Mobilisation and demobilisation of plant and equipment

Installation, maintenance and removal of ‘WORK STARTS HERE’ (Bilingual – Welsh over English) signage, including start dates and duration of the works

Installation, maintenance and removal of back to back, Lane 2 closures at crossover points 10/2 and 14/5 to facilitate opening and closing of Wire Rope Safety Fences (WRSF)

Removal, re-installation and

re-tensioning of WRSF at crossover points 10/2 and 14/5.

Traffic Safety Control Officer and vehicle (Rate per day shift 07.00 to 19.00)

Traffic Safety Control Officer and vehicle (Rate per night shift 19.00 to 07.00)

Sequence 1 - Works on A55 Anglesey East Bound Carriageway

Installation, maintenance and removal of Traffic Management for closure of Lay-by’s at Marker Post (MP) ref. 2/7 E/B (Abnormal Load holding area) MP ref. 10/1 E/B and W/B, MP ref. 12/7W/B

(Include for lay-by ahead and lay-by closed signage)

Installation, maintenance and removal of Abnormal Load signage and bespoke signs for diversions

Installation, maintenance and removal of Traffic Management for closure of Junction 5 East Bound off and on slip roads, including diversion route signage and Junction 5 E/B, slip roads closure date signage.

Installation, maintenance and removal of Traffic Management Approach, LANE CHANGE, LEAD-IN and END zones, crossover arrangements at crossing points 10/2 and 14/5 and cylinder cones with buffer zone along centerline length of contraflow on West Bound carriageway.

Installation, maintenance and removal of 4 no. mobile tower lighting units.

2 no. at each crossover point location.

Sequence 2 - Works on A55 Anglesey West Bound Carriageway

Installation, maintenance and removal of Traffic Management for closure of Lay-by’s at Marker Post (MP) ref. 15/4 W/B (Abnormal Load holding area) MP ref. 12/7 W/B and MP ref. 10/1W/B and E/B

(Include for lay-by ahead and lay-by closed signage)

Installation, maintenance and removal of Abnormal Load signage and bespoke signs for diversions

Installation, maintenance and removal of Traffic Management for closure of Junction 5 West Bound off and on slip roads, including diversion route signage and Junction 5 W/B, slip roads closure date signage.

Installation, maintenance and removal of Traffic management APPROACH, LANE CHANGE, LEAD-IN and END zones, crossover arrangements at crossing points 10/2 and 14/5 and cylinder cones with buffer zone along centerline length of contraflow on East Bound carriageway.

Installation, maintenance and removal of 4 no. mobile tower lighting units.

2 no. at each crossover point location.

3 Conditions for Participation

3.1

Minimum standards and qualification required

Please see Qualification Section on etenderwales for conditions of participation. were there are Pass/fail criteria to responded to.

The Traffic Management Subcontractor must have the following sector scheme accreditations 12A, 12b, 12C and 12D, and must have the sufficient trained TSCO for the durtation of the works.

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

6337

4.3

Time Limits

Time-limit for receipt of completed tenders
    14-05-2018  Time  13:00

Estimated award date
 18-05-2018

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

5 Other Information

5.1

Additional Information

(WA Ref:81253)

5.2

Additional Documentation

5.3

Publication date of this notice

 25-04-2018

Coding

Commodity categories

ID Title Parent category
45000000 Construction work Construction and Real Estate

Delivery locations

ID Description
1012 Gwynedd
1011 Isle of Anglesey

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
25 April 2018
Deadline date:
14 May 2018 00:00
Notice type:
Contract Notice
Authority name:
Cyngor Gwynedd
Publication date:
21 May 2018
Notice type:
Contract Award Notice
Authority name:
Cyngor Gwynedd

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.