Total quantity or scope of tender
Phase 10 –
Design of Traffic Management and submission of CAD TM Drawings for Phase 10, East and West Bound, by 21st May 2018, two weeks prior to start date
Mobilisation and demobilisation of plant and equipment
Installation, maintenance and removal of ‘WORK STARTS HERE’ (Bilingual – Welsh over English) sinage, including start dates and duration of the works
Installation, maintenance and removal of back to back, Lane 2 closures at crossover points 17/9 and 23/8 to facilitate opening and closing of Wire Rope Safety Fences (WRSF)
Removal, re-installation and
re-tensioning of WRSF at crossover points 17/9 and 23/8.
Traffic Safety Control Officer and vehicle (Rate per day shift 07.00 to 19.00)
Traffic Safety Control Officer and vehicle (Rate per night shift 19.00 to 07.00)
Sequence 1 - Works on A55 Anglesey West Bound Carriageway
Installation, maintenance and removal of Traffic Management for closure of Lay-by’s at Marker Post (MP) ref. 26/4 W/B (Abnormal Load holding area) MP ref. 20/2 E/B and MP ref. 18/2 E/B
(Include for lay-by ahead and lay-by closed signage)
Installation, maintenance and removal of Abnormal Load signage and bespoke signs for diversions
Installation, maintenance and removal of Traffic Management for closure of Junction 6 West Bound off and on slip roads, including diversion route signage and Junction 6 W/B, slip roads closure date signage.
Installation, maintenance and removal of Traffic Management APPROACH, LANE CHANGE, LEAD-IN and END zones, crossover arrangements at crossing points 17/9 and 23/8 and cylinder cones with buffer zone along centerline length of contraflow on East Bound carriageway.
Installation, maintenance and removal of 4 no. mobile tower lighting units. 2 no. at each crossover point location.
Sequence 2 - Works on A55 Anglesey East Bound Carriageway
Installation, maintenance and removal of Traffic Management for closure of Lay-by’s at Marker Post (MP) ref. 15/3 E/B (Abnormal Load holding area) MP ref. 18/2 W/B and MP ref.20/2 W/B
(Include for lay-by ahead and lay-by closed signage)
Installation, maintenance and removal of Abnormal Load signage and bespoke signs for diversions
Installation, maintenance and removal of Traffic Management for closure of Junction 6 East Bound off and on slip roads, including diversion route signage and Junction 6, E/B slip roads closure date signage.
Installation, maintenance and removal of Traffic Management APPROACH, LANE CHANGE, LEAD-IN and END zones, crossover arrangements at crossing points 17/9 and 23/8 and cylinder cones with buffer zone along centerline length of contraflow on West Bound carriageway.
Installation, maintenance and removal of 4 no. mobile tower lighting units.
2 no. at each crossover point location.
Phase 9 –
Design of Traffic Management and submission of CAD TM Drawings for Phase 9, West and East Bound by 3rd September, 2018, two weeks prior to start date
Mobilisation and demobilisation of plant and equipment
Installation, maintenance and removal of ‘WORK STARTS HERE’ (Bilingual – Welsh over English) signage, including start dates and duration of the works
Installation, maintenance and removal of back to back, Lane 2 closures at crossover points 10/2 and 14/5 to facilitate opening and closing of Wire Rope Safety Fences (WRSF)
Removal, re-installation and
re-tensioning of WRSF at crossover points 10/2 and 14/5.
Traffic Safety Control Officer and vehicle (Rate per day shift 07.00 to 19.00)
Traffic Safety Control Officer and vehicle (Rate per night shift 19.00 to 07.00)
Sequence 1 - Works on A55 Anglesey East Bound Carriageway
Installation, maintenance and removal of Traffic Management for closure of Lay-by’s at Marker Post (MP) ref. 2/7 E/B (Abnormal Load holding area) MP ref. 10/1 E/B and W/B, MP ref. 12/7W/B
(Include for lay-by ahead and lay-by closed signage)
Installation, maintenance and removal of Abnormal Load signage and bespoke signs for diversions
Installation, maintenance and removal of Traffic Management for closure of Junction 5 East Bound off and on slip roads, including diversion route signage and Junction 5 E/B, slip roads closure date signage.
Installation, maintenance and removal of Traffic Management Approach, LANE CHANGE, LEAD-IN and END zones, crossover arrangements at crossing points 10/2 and 14/5 and cylinder cones with buffer zone along centerline length of contraflow on West Bound carriageway.
Installation, maintenance and removal of 4 no. mobile tower lighting units.
2 no. at each crossover point location.
Sequence 2 - Works on A55 Anglesey West Bound Carriageway
Installation, maintenance and removal of Traffic Management for closure of Lay-by’s at Marker Post (MP) ref. 15/4 W/B (Abnormal Load holding area) MP ref. 12/7 W/B and MP ref. 10/1W/B and E/B
(Include for lay-by ahead and lay-by closed signage)
Installation, maintenance and removal of Abnormal Load signage and bespoke signs for diversions
Installation, maintenance and removal of Traffic Management for closure of Junction 5 West Bound off and on slip roads, including diversion route signage and Junction 5 W/B, slip roads closure date signage.
Installation, maintenance and removal of Traffic management APPROACH, LANE CHANGE, LEAD-IN and END zones, crossover arrangements at crossing points 10/2 and 14/5 and cylinder cones with buffer zone along centerline length of contraflow on East Bound carriageway.
Installation, maintenance and removal of 4 no. mobile tower lighting units.
2 no. at each crossover point location.
|