Contract Award Notice

Ffordd Bleddyn

  • First published: 10 April 2025
  • Last modified: 10 April 2025
  • Record interest

     

  • This file may not be fully accessible.

  •  

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-kuma6s-148527
Published by:
Transport for Wales
Authority ID:
AA50685
Publication date:
10 April 2025
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
No

Abstract

This Scope relates to the completion of outstanding scope of the construction of a new overbridge at Ffordd Bleddyn. In addition to the bridge, the recently completed construction works included highway realignment and utility diversions. Works Completed by Others, include but are not limited to the following, and are to be verified by the Contractor; • Cabling/Switchover Works, o Cabling and electrical switchover works as part of the traffic management (TM) phase 1, • BT Chamber Removal and backfill, • Southeast (SE) Corner Civil Works, o The reinforced concrete (RC) base for the a Vehicle Restraint System (VRS) was installed, o Signage, the RC foundation for Column 2N, signal sockets, edgings, tactile paving, and VRS were installed, o Construction of Taff Trail footpath corner, • Column Installation, o Column 2N was erected at the designated location and all necessary connections were made, o The electrical connection was completed between Column 2N and Column 1N, • Site Clean-Up and Boundary Installation, o The boundary fence was installed along the VRS/guardrails, securing the area, • Road Reopening, o The road was reopened to traffic under temporary traffic light control and pedestrian crossings. • Any other completed works completed by Others. The works to be completed, include but are not limited to the following, and are to be verified by the Contractor; • Cardiff Road drainage works, • Cardiff Road Civils work - install traffic signal NALs, chamber, ducting, height extension to existing steel parapet to cycleway, • Cardiff Road Civils work – Street Light ducting, chamber, and column 1N RC foundation. Kerbs, Edgings, Tactiles, Signs, Ped Guardrails, tarmac to binder level etc., • Install traffic signal poles, lights, push buttons, and cabling, • Maintain existing temporary TM arrangements until permanent TM has been installed and commissioned, • Remove TM and re-open road fully to the public under the new permanent traffic light system, • Palisade fencing works along the track and top of the wingwall, • Knotweed removal by hand, • Install key clamp up the wingwall and waterproofing, • Install boundary fence on the batter and finish topsoil around this area, • Profile planing required on Cardiff Road and footpaths. • Install plug joints, install tarmac on Cardiff Road, • install ped guardrail to close off south footpath, surface south footpath, and finish road markings, • any other incomplete works required by this Contract.

Full notice text

CONTRACT AWARD NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


Transport for Wales

3 Llys Cadwyn, Taff Street,

Pontypridd

CF37 4TH

UK

Chris Perry

+44 2921673434


2 Contract Details

2.1

Title

Ffordd Bleddyn

2.2

Description of the contract

This Scope relates to the completion of outstanding scope of the construction of a new overbridge at Ffordd Bleddyn. In addition to the bridge, the recently completed construction works included highway realignment and utility diversions.

Works Completed by Others, include but are not limited to the following, and are to be verified by the Contractor;

• Cabling/Switchover Works,

o Cabling and electrical switchover works as part of the traffic management (TM) phase 1,

• BT Chamber Removal and backfill,

• Southeast (SE) Corner Civil Works,

o The reinforced concrete (RC) base for the a Vehicle Restraint System (VRS) was installed,

o Signage, the RC foundation for Column 2N, signal sockets, edgings, tactile paving, and VRS were installed,

o Construction of Taff Trail footpath corner,

• Column Installation,

o Column 2N was erected at the designated location and all necessary connections were made,

o The electrical connection was completed between Column 2N and Column 1N,

• Site Clean-Up and Boundary Installation,

o The boundary fence was installed along the VRS/guardrails, securing the area,

• Road Reopening,

o The road was reopened to traffic under temporary traffic light control and pedestrian crossings.

• Any other completed works completed by Others.

The works to be completed, include but are not limited to the following, and are to be verified by the Contractor;

• Cardiff Road drainage works,

• Cardiff Road Civils work - install traffic signal NALs, chamber, ducting, height extension to existing steel parapet to cycleway,

• Cardiff Road Civils work – Street Light ducting, chamber, and column 1N RC foundation. Kerbs, Edgings, Tactiles, Signs, Ped Guardrails, tarmac to binder level etc.,

• Install traffic signal poles, lights, push buttons, and cabling,

• Maintain existing temporary TM arrangements until permanent TM has been installed and commissioned,

• Remove TM and re-open road fully to the public under the new permanent traffic light system,

• Palisade fencing works along the track and top of the wingwall,

• Knotweed removal by hand,

• Install key clamp up the wingwall and waterproofing,

• Install boundary fence on the batter and finish topsoil around this area,

• Profile planing required on Cardiff Road and footpaths.

• Install plug joints, install tarmac on Cardiff Road,

• install ped guardrail to close off south footpath, surface south footpath, and finish road markings,

• any other incomplete works required by this Contract.

2.3

Notice Coding and Classification

31518000 Signalling lights
34942000 Signalling equipment
34990000 Control, safety, signalling and light equipment
44115100 Ducting
44212100 Bridge
45111240 Ground-drainage work
45213321 Railway station construction work
45221100 Construction work for bridges
45221110 Bridge construction work
45221112 Railway bridge construction work
45221113 Footbridge construction work
45232450 Drainage construction works
45232452 Drainage works
45233000 Construction, foundation and surface works for highways, roads
45233130 Construction work for highways
45233294 Installation of road signals
45234100 Railway construction works
45234116 Track construction works
45262210 Foundation work
45316200 Installation of signalling equipment
45340000 Fencing, railing and safety equipment installation work
50232200 Traffic-signal maintenance services
100 UK - All
1000 WALES
1010 West Wales and The Valleys
1011 Isle of Anglesey
1012 Gwynedd
1013 Conwy and Denbighshire
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1017 Bridgend and Neath Port Talbot
1018 Swansea
1020 East Wales
1021 Monmouthshire and Newport
1022 Cardiff and Vale of Glamorgan
1023 Flintshire and Wrexham
1024 Powys

2.4

Estimated Total Value

3 Procedure

3.1

Type of Procedure

Single stage

4 Award of Contract

4.1

Successful Bidders

4.1.1

Name and Address of successful supplier, contractor or service provider





Involve Rail Ltd

Amber House, Upper Boat Business Centre,

Pontypridd

CF375BP

UK




5 Other Information

5.1

Reference number attributed to the notice by the contracting authority

N/a

5.2

Date of Contract Award

 09-04-2025

5.3

Number of tenders received

1

5.4

Other Information

(WA Ref:149673)

5.5

Additional Documentation

N/a

5.6

Publication date of this notice:

 10-04-2025

Coding

Commodity categories

ID Title Parent category
44212100 Bridge Structural products and parts except prefabricated buildings
45221110 Bridge construction work Construction work for bridges and tunnels, shafts and subways
45221100 Construction work for bridges Construction work for bridges and tunnels, shafts and subways
45233130 Construction work for highways Construction, foundation and surface works for highways, roads
45233000 Construction, foundation and surface works for highways, roads Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
34990000 Control, safety, signalling and light equipment Miscellaneous transport equipment and spare parts
45232450 Drainage construction works Ancillary works for pipelines and cables
45232452 Drainage works Ancillary works for pipelines and cables
44115100 Ducting Building fittings
45340000 Fencing, railing and safety equipment installation work Building installation work
45221113 Footbridge construction work Construction work for bridges and tunnels, shafts and subways
45262210 Foundation work Special trade construction works other than roof works
45111240 Ground-drainage work Demolition, site preparation and clearance work
45233294 Installation of road signals Construction, foundation and surface works for highways, roads
45316200 Installation of signalling equipment Installation work of illumination and signalling systems
45221112 Railway bridge construction work Construction work for bridges and tunnels, shafts and subways
45234100 Railway construction works Construction work for railways and cable transport systems
45213321 Railway station construction work Construction work for commercial buildings, warehouses and industrial buildings, buildings relating to transport
34942000 Signalling equipment Railway equipment
31518000 Signalling lights Electric filament lamps
45234116 Track construction works Construction work for railways and cable transport systems
50232200 Traffic-signal maintenance services Maintenance services of public-lighting installations and traffic lights

Delivery locations

ID Description
1017 Bridgend and Neath Port Talbot
1022 Cardiff and Vale of Glamorgan
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1013 Conwy and Denbighshire
1020 East Wales
1023 Flintshire and Wrexham
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1012 Gwynedd
1011 Isle of Anglesey
1021 Monmouthshire and Newport
1024 Powys
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1018 Swansea
100 UK - All
1000 WALES
1010 West Wales and The Valleys

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
26 February 2025
Deadline date:
21 March 2025 00:00
Notice type:
Contract Notice
Authority name:
Transport for Wales
Publication date:
10 April 2025
Notice type:
Contract Award Notice
Authority name:
Transport for Wales

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.