II.2.3) Place of performance
NUTS code:
UKL22
II.2.4) Description of the procurement
Compatibility
Proposed refurbishment of two lifts to work with existing lift grouping (6 lift group)
Due to urgency, the actual work needs to commence January 2nd 2017 and both lifts need to be completed and operational by April 3rd 2017.
Motor Room:
Controller: Provide and install new advanced microprocessor with built in diagnostic capabilities.
Stop Switch: Provide and install new safety stop switch located adjacent to controller
Notices: Provide and install new safety notices for the motor room as necessary, for safe working.
Machine: Provide and install new compact gearless machine driven by microprocessor technology which optimised lift behaviour and ride comfort (Speed 1.75m/s)
Wiring: Replace existing wiring with new PVC to suit the site conditions
Emergency Stop Switches
Rope Hoes: Extend holes through floor slab for suspension belts
Test existing lifting beams.
Lift Shaft: Provide and fit proven polyurethane coated flat belts with car and counterweight adaptors and belt pulleys
Shaft Wiring: Replace existing wiring with new PVC to suit site conditions
Trailing Cables Replace existing travelling cables
Pit Stop Switch Provide and install new mushroom headed safety type stop switch for safe working
Well Switches: Provide and install new limit switches to operate in conjunction with tape head system
Counterweight: Rebalance the counterweight
Replace existing shaft lighting
New Oil buffers
Lift Car:
Provide and install new TOP of Car Inspection Unit to comply with BS7255 (EN81), for safe working on lifts
Car fixtures: Provide and install new Otis stainless finish car operating panel
Door Operator Existing to remain
Car Interior Existing to remain
Car and Landing Sills: Supply and Install new stainless Steel Sills
Landing:
Landing Fixtures: Provide and Install new Otis push buttons at disabled access height, dual riser of full collective triplex operation. Provide and install new position indicator with lift direction arrow and gongs to all floors,
Landing entrances: Provide new type tested locks to each landing entrance
Landing locks: provide new type tested locks to each landing entrance
Architraves: existing to remain. Provisional sum for renewal of 1000 GBP per SF entrance.
Aesthetic Items
Stainless Steel Sills,
New counterweight screen
New hydraulic oils (2Nr)
New OSG (Not A3 as this is covered by machine)
De-group
Rebalance
New emergency shaft lighting
Three way intercom
Renew Guide shoe liners
Painting counterweights yellow.
Building works:
All associated building works .
Act as principle contractor would be responsible for all Construction Design Management.
II.2.11) Information about options
Options:
No
II.2.13) Information about European Union funds
The procurement is related to a project and/or programme financed by European Union funds:
No