Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

Contract Notice

Demolition & Build at RSPB Visitors Centre South Stack, Angelsey

  • First published: 23 January 2019
  • Last modified: 26 February 2019
  • Version: N/A
  • This file may not be fully accessible.

  •  

Information icon
You are viewing an expired notice.

Contents

Summary

OCID:
ocds-kuma6s-088993
Published by:
RSPB
Authority ID:
AA1076
Publication date:
23 January 2019
Deadline date:
26 February 2019
Notice type:
Contract Notice
Has documents:
Yes
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The RSPB invites you to submit a tender for the following project:Partial demolition and build of the visitors centre and associated office space at RSPB South Stack Cliffs, Anglesey The project includes: • Demolition of two storey existing structures • Construction of new two storey extension • Improvements within the existing accommodation • New drainage system and external works including package • We would expect the building will be closed during the construction period. sewage treatment system incorporating a tertiary reedbed & drainage mound.For specifications please refer to drawings. The existing two storey structure which houses the reserve offices, staff welfare facilities and public toilets at the RSPB South Stack Visitors Centre is reaching the end of its natural life. The building is no longer fit for purpose; is outdated and has numerous leaks and temporary repairs. The work will entail partially demolishing the two-storey structure and part of the single-storey structure, replacing them with a purpose-built modern facility for the 21st Century The new extension will be an elegant contemporary rectilinear building complemented by the minimal choice of materials and has been designed to reflect the local landscape. The new building, through ground-to-ceiling window panes, will further open-up the dramatic South Stack vista and showcase the natural beauty of the AONB. The building design and visualisations have been prepared by architect firm Ymgynghoriaeth Gwynedd Consultancy (YGC) based in Caernarfon who have also been appointed as Principal Designer. The site is located at RSPB Reserve South Stack Holyhead LL65 1YH. South Stack Cliffs are located on Holy Island in Anglesey, a wonderful nature reserve made up of heathland and farmland set on a stretch of dramatic sea cliffs. Environmental considerations The development sits with an Area of Outstanding Natural Beauty (AONB). The building works will be adjacent to a Site of Special Scientific Interest (SSSI), and a European Protected Site (SPA and SAC). The design for the sewage treatment works and associated tertiary system sit within the SSSI, SPA and SAC. The reserve is especially important for its rare breeding choughs. As such, all precautions must be taken ensure protect land is not polluted or damaged by works undertaken on site. More details of which can be found with the outline CEMP, Environmental Impact Assessment Screening Report and Ecology Survey Tender Documents - Pre-Qualification Questionnaire for Principal Contractors - Submit with tender - Priced documents (Schedule of Works) - Submit with tender - Scope: Include the following in the Contractors Proposal: Technical Information on the SFS system, and it is required for the Contractor to explain their procedure to appoint the proposed contractor design package and to name the company that’s intended to be used - Submit with tender - Submit copy of Environmental Policy: Evidence of compliance - Submit with tender - Project Environmental Management System: Develop a system compatible with the environmental policy. Reference also to be made to project specific issues raised in the CEMP report. (See preliminaries for more details) - Submit with tender - Statement: Describe the organisation and resources to control the quality of the Works, including the works of the subcontractors. QA Staff: Identify in a statement the number and type of staff responsible for quality control, with details of qualifications and duties - Submit with tender - Statement: describe the organisation and resources to safeguard the health and safety of operatives, including those of subcontractors, and of any person the Works may affect. Include: - a copy of health and safety policy document, including risk assessment procedures - Accident and sickness records for the past 5 years - Records of previous Health and Safety Executive enforcement action - Records of training and training policy - T

Full notice text

CONTRACT NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


RSPB

RSPB South Stack, South Stack Road,

Holyhead

LL65 1YH

UK

Sam Yates

+44 1248672864

samuel.yates@rspb.org.uk

https://www.rspb.org.uk
www.sell2wales.gov.wales
www.sell2wales.gov.wales

1.2

Address from which documentation may be obtained

As in 1.1

1.3

Completed documents must be returned to:

As in 1.1

2 Contract Details

2.1

Title

Demolition & Build at RSPB Visitors Centre South Stack, Angelsey

2.2

Description of the goods or services required

The RSPB invites you to submit a tender for the following project:Partial demolition and build of the visitors centre and associated office space at RSPB South Stack Cliffs, Anglesey

The project includes:

• Demolition of two storey existing structures

• Construction of new two storey extension

• Improvements within the existing accommodation

• New drainage system and external works including package

• We would expect the building will be closed during the construction period. sewage treatment system incorporating a tertiary reedbed & drainage mound.For specifications please refer to drawings.

The existing two storey structure which houses the reserve offices, staff welfare facilities and public toilets at the RSPB South Stack Visitors Centre is reaching the end of its natural life. The building is no longer fit for purpose; is outdated and has numerous leaks and temporary repairs.

The work will entail partially demolishing the two-storey structure and part of the single-storey structure, replacing them with a purpose-built modern facility for the 21st Century

The new extension will be an elegant contemporary rectilinear building complemented by the minimal choice of materials and has been designed to reflect the local landscape. The new building, through ground-to-ceiling window panes, will further open-up the dramatic South Stack vista and showcase the natural beauty of the AONB.

The building design and visualisations have been prepared by architect firm Ymgynghoriaeth Gwynedd Consultancy (YGC) based in Caernarfon who have also been appointed as Principal Designer.

The site is located at RSPB Reserve South Stack Holyhead LL65 1YH. South Stack Cliffs are located on Holy Island in Anglesey, a wonderful nature reserve made up of heathland and farmland set on a stretch of dramatic sea cliffs.

Environmental considerations

The development sits with an Area of Outstanding Natural Beauty (AONB). The building works will be adjacent to a Site of Special Scientific Interest (SSSI), and a European Protected Site (SPA and SAC). The design for the sewage treatment works and associated tertiary system sit within the SSSI, SPA and SAC. The reserve is especially important for its rare breeding choughs.

As such, all precautions must be taken ensure protect land is not polluted or damaged by works undertaken on site. More details of which can be found with the outline CEMP, Environmental Impact Assessment Screening Report and Ecology Survey

Tender Documents

- Pre-Qualification Questionnaire for Principal Contractors - Submit with tender

- Priced documents (Schedule of Works) - Submit with tender

- Scope: Include the following in the Contractors Proposal:

Technical Information on the SFS system, and it is required for the Contractor to explain their procedure to appoint the proposed contractor design package and to name the company that’s intended to be used - Submit with tender

- Submit copy of Environmental Policy: Evidence of compliance - Submit with tender

- Project Environmental Management System: Develop a system compatible with the environmental policy. Reference also to be made to project specific issues raised in the CEMP report. (See preliminaries for more details) - Submit with tender

- Statement: Describe the organisation and resources to control the quality of the Works, including the works of the subcontractors. QA Staff: Identify in a statement the number and type of staff responsible for quality control, with details of qualifications and duties - Submit with tender

- Statement: describe the organisation and resources to safeguard the health and safety of operatives, including those of subcontractors, and of any person the Works may affect. Include:

- a copy of health and safety policy document, including risk assessment procedures

- Accident and sickness records for the past 5 years

- Records of previous Health and Safety Executive enforcement action

- Records of training and training policy

- The number and type of staff responsible for health and safety responsible for health and safety of this project with details of their qualifications and duties - submit with tender

- Programme of work: Prepare a summary showing the sequence and timing of the principal parts of the Works and period for planning and design. Itemise any work that is excluded - Submit with tender

- Outline Construction phase health and safety plan (See Preliminaries for more details) - submit within one week of request.

Weighting

PQQ & Health and Safety 5%

Price 70%

Scope 5%

Environmental 10%

Quality 5%

Programme 5%

More details can be found in documentation, starting with the Client Brief.

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=88993.

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.

Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.

2.3

Notice Coding and Classification

45000000 Construction work
71000000 Architectural, construction, engineering and inspection services
100 UK - All
1000 WALES
1010 West Wales and The Valleys
1011 Isle of Anglesey
1012 Gwynedd
1013 Conwy and Denbighshire
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1017 Bridgend and Neath Port Talbot
1018 Swansea
1020 East Wales
1021 Monmouthshire and Newport
1022 Cardiff and Vale of Glamorgan
1023 Flintshire and Wrexham
1024 Powys

2.4

Total quantity or scope of tender

3 Conditions for Participation

3.1

Minimum standards and qualification required

a. Perform role of Principal Contractor as per Construction (Design and Management) Regulations 2015.

b. Responsibility to maintain the Health and Safety File from the Principle Designer on behalf of the client following Construction (Design and Management) Regulations 2015.

c. Liaise with the Principle Designer, including a site visit to ensure that the design and its implications are fully realised.

d. Provide adequate welfare provision for site contractors following Construction (Design and Management) Regulations 2015.

e. Produce a Construction Phase Plan, a legal requirement of the Construction (Design and Management) Regulations 2015 before works can commence on site.

f. Prior to the start of works on site a Construction Environmental Management Plan describing works, including temporary works, to be undertaken and to be implemented during the construction phase must be completed.

g. All waste should be disposed of correctly following environmental legislation.

h. Ensure that safety signage and barriers are in place, adhering to HSE legislation and Construction (Design and Management) Regulations 2015.

i. Any waste disposal will require the appropriate permissions and licences.

j. The contractor must adhere to and complete any relevant actions in the Principal Designers Risk Register.

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

RSPB South Stack, Anglesey

4.3

Time Limits

Time-limit for receipt of completed tenders
    19-02-2019  Time  12:00

Estimated award date
 26-02-2019

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN 

4.6

Tender Submission Postbox

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx

5 Other Information

5.1

Additional Information

Please see client brief for more details

(WA Ref:88993)

Relates to the following project/programme financed by EU Community Funds: Works partially funded by Tourism Amenity Investment Support (TAIS) Visit Wales

5.2

Additional Documentation

RSPB South Stack Tender Package

5.3

Publication date of this notice

 23-01-2019

Coding

Commodity categories

ID Title Parent category
71000000 Architectural, construction, engineering and inspection services Construction and Real Estate
45000000 Construction work Construction and Real Estate

Delivery locations

ID Description
1017 Bridgend and Neath Port Talbot
1022 Cardiff and Vale of Glamorgan
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1013 Conwy and Denbighshire
1020 East Wales
1023 Flintshire and Wrexham
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1012 Gwynedd
1011 Isle of Anglesey
1021 Monmouthshire and Newport
1024 Powys
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1018 Swansea
100 UK - All
1000 WALES
1010 West Wales and The Valleys

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
23 January 2019
Deadline date:
26 February 2019 00:00
Notice type:
Contract Notice
Authority name:
RSPB
Publication date:
24 July 2019
Notice type:
Contract Award Notice
Authority name:
RSPB

About the buyer

Main contact:
samuel.yates@rspb.org.uk
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
04/02/2019 17:20
ADDED FILE: Utility information and drawings
Utility information and drawings
04/02/2019 17:23
ADDED FILE: Work Operations in Excel
Work Operations in Excel
05/02/2019 14:40
ADDED FILE: REVISED Comar NBS Specs
Please see REVISED Comar NBS Spec,removal of the automatic operation to the main entrance door CW04
05/02/2019 14:56
Further response to question re fire plan
Further response to Question -

Q: Could you please provide a proposed fire plan if available

Response:

For the time being you can make reference to drawings:
6237 AL(0-)12b
And
6237 AL(0-)13c

It shows the fire enclosures / partitions in red.
08/02/2019 09:25
ADDED FILE: Lighting Drawing Revision 6237_E02_RevA
Please lighting drawing 6237_E02_RevA lighting Drawing with inclusion of lighting sensors
11/02/2019 15:49
ADDED FILE: Prem Tech Wastewater Treatment
Prem Tech Wastewater Treatment infomation. Please note tank is DSAF and NOT CSAF model.
12/02/2019 11:48
ADDED FILE: revised mechanical specification to clarify the requirements of the supply AHU to the kitchen.
Revised mechanical spec & schedule (10) to clarify requirements of supply AHU to the kitchen.

13/02/2019 17:25
ADDED FILE: Revised drawings with drawing register for fire protection
Revised drawings with drawing register for fire protection
14/02/2019 13:26
Question and Answers deadline change
The deadline for submission of questions through the online Q&A function has been changed as below.
Old question submission deadline: 15/02/2019 12:00
New question submission deadline: 26/02/2019 12:00
Please ensure that you have submitted all questions before the new date.
14/02/2019 14:43
Notice date(s) changed
The Deadline date was changed from 19/02/2019 12:00 to 26/02/2019 10:00.

Delay in response to a question - in order to give time for contractors to gather costs we have decided to extend the tender by a week.
14/02/2019 14:43
Notice date(s) changed
The Deadline date was changed from 19/02/2019 12:00 to 26/02/2019 10:00.

Delay in response to a question - in order to give time for contractors to gather costs we have decided to extend the tender by a week.
14/02/2019 14:44
Notice date(s) changed
The Deadline date was changed from 19/02/2019 12:00 to 26/02/2019 10:00.

Delay in response to a question - in order to give time for contractors to gather costs we have decided to extend the tender by a week.
19/02/2019 10:45
ADDED FILE: Please see tender amendment for Wastewater Treatment quote - now includes the pumping station.
Please see tender amendment for Wastewater Treatment - now includes the pumping station.
19/02/2019 10:49
ADDED FILE: Installation guidelines sewage treatment works
Please find attached Installation guidelines sewage treatment works
26/02/2019 09:40
Notice date(s) changed
The Deadline date was changed from 26/02/2019 10:00 to 26/02/2019 16:00.

Deadline will be 16:00

Postbox

The awarding buyer has indicated that it will accept electronic responses to this notice via the Tender Submission Postbox facility.

Submit your tender response electronically in a secure environment.

To create an electronic response please click the "Add to my interest list" button at the top of the page.

For more information on the Postbox Facility please refer to the user guide:

Q&A

Ask the buyer any questions you may have relating to this notice. To ask the buyer a question or questions please click the "View Questions and Answers" button.

Additional documents

The following additional documents have been attached to this notice. To obtain these documents please select the individual file names below.

Current documents

xls
xls145.00 KB
This file may not be accessible.
zip
zip2.07 MB
This file may not be accessible.
zip
zip47.33 MB
This file may not be accessible.
pdf
pdf218.60 KB
This file may not be accessible.
zip
zip2.01 MB
This file may not be accessible.
zip
zip1.12 MB
This file may not be accessible.
pdf
pdf650.56 KB
This file may not be accessible.
pdf
pdf174.82 KB
This file may not be accessible.
pdf
pdf660.97 KB
This file may not be accessible.
zip
zip946.73 KB
This file may not be accessible.

Replaced documents

There are no previous versions of these documents.


0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.