Skip to main content

We've saved some files called cookies on your device. These cookies are:

  • essential for the site to work
  • to help improve our website by collecting and reporting information on how you use it

We would also like to save some cookies to help tailor communications.

BETA
You're viewing an updated version of this service - your feedback will help us to improve it.

06 Contract Award Notice (Utilities) - Incomplete Procedure

Transport for Wales Rail Mk4 Rebranding

  • First published: 25 July 2023
  • Last modified: 25 July 2023

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-kuma6s-123312
Published by:
Transport for Wales Rail Limited (Utility Buyer)
Authority ID:
AA80566
Publication date:
25 July 2023
Deadline date:
-
Notice type:
06 Contract Award Notice (Utilities) - Incomplete Procedure
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The Mk-4 Rolling Stock is a mixture of passenger and driver trailer vehicles. TfWR has purchased the following types: - Tourist Open End (TOE); - Tourist Open (TO); - Tourist Open Disabled (TOD); - Service Vehicle (SV); - Premium Open Disabled (POD); and - Driver Van Trailer (DVT). The rolling stock was purchased in two (2) tranches: - Tranche 1 – most recently operated by LNER; and - Tranche 2 – most recently operated by Grand Central. The Mk 4 vehicles have been formed into rakes consisting of one of each type of vehicle together with a Class 67 Vehicle. The current livery of the combined fleet will be mixed and not instantly recognisable as TfWR operated trains. There are also issues with compliance of the Grand Central fleet with regards to PRM regulations. In addition to this the LNER vehicles are vinyl wrapped and are already showing signs of aging with a dull appearance, blemishes and breaks in the vinyl. To address the brand identity and PRM issues TfWR contracted DG8, a rail industrial design consultancy, to facilitate and produce concepts, designs and costings based upon the working groups requirements and compliance with industry standards. The current re-branding exclude the Class 67 locomotive that is used to haul the Mk-4 Rolling Stock. TfWR are now seeking a supplier or suppliers that can provide the services stated in the RfP. CPV: 71311230, 71311230.

Full notice text

Contract award notice – utilities

Section I: Contracting entity

I.1) Name and addresses

Transport for Wales Rail Limited (Utility Buyer)

3 Llys Cadwyn, Pontypridd

Rhondda Cynon Taf

CF37 4TH

UK

Contact person: Paul M. Peters

Telephone: +44 7941365603

E-mail: paulmpeters@omniaprocurement.onmicrosoft.com

NUTS: UKL

Internet address(es)

Main address: http://www.tfwrail.wales

Address of the buyer profile: https://www.sell2wales.gov.wales/search/Search_AuthProfile.aspx?ID=AA80566

I.2) Joint procurement

The contract is awarded by a central purchasing body

I.6) Main activity

Railway services

Section II: Object

II.1) Scope of the procurement

II.1.1) Title

Transport for Wales Rail Mk4 Rebranding

II.1.2) Main CPV code

71311230

 

II.1.3) Type of contract

Services

II.1.4) Short description

The Mk-4 Rolling Stock is a mixture of passenger and driver trailer vehicles. TfWR has purchased the following types:

- Tourist Open End (TOE);

- Tourist Open (TO);

- Tourist Open Disabled (TOD);

- Service Vehicle (SV);

- Premium Open Disabled (POD); and

- Driver Van Trailer (DVT).

The rolling stock was purchased in two (2) tranches:

- Tranche 1 – most recently operated by LNER; and

- Tranche 2 – most recently operated by Grand Central.

The Mk 4 vehicles have been formed into rakes consisting of one of each type of vehicle together with a Class 67 Vehicle.

The current livery of the combined fleet will be mixed and not instantly recognisable as TfWR operated trains. There are also issues with compliance of the Grand Central fleet with regards to PRM regulations.

In addition to this the LNER vehicles are vinyl wrapped and are already showing signs of aging with a dull appearance, blemishes and breaks in the vinyl.

To address the brand identity and PRM issues TfWR contracted DG8, a rail industrial design consultancy, to facilitate and produce concepts, designs and costings based upon the working groups requirements and compliance with industry standards.

The current re-branding exclude the Class 67 locomotive that is used to haul the Mk-4 Rolling Stock.

TfWR are now seeking a supplier or suppliers that can provide the services stated in the RfP.

II.1.6) Information about lots

This contract is divided into lots: No

II.1.7) Total value of the procurement

Lowest offer:   / Highest offer:  

II.2) Description

II.2.2) Additional CPV code(s)

71311230

II.2.3) Place of performance

NUTS code:

UK

II.2.4) Description of the procurement

The Mk-4 Rolling Stock is a mixture of passenger and driver trailer vehicles that were originally built in 1989 by Metro-Cammell as part of the IC225 fleet operated on the East Coast Mainline. TfWR has purchased the following types:

- Tourist Open End - (TOE);

- Tourist Open - (TO);

- Tourist Open Disabled - (TOD);

- Service Vehicle - (SV);

- Premium Open Disabled – (POD); and

- Driver Van Trailer (DVT).

The rolling stock was purchased in two (2) tranches:

- Tranche 1 – most recently operated by LNER; and

- Tranche 2 – most recently operated by Grand Central.

The Mk 4 vehicles have been formed into rakes consisting of one of each type of vehicle together with a Class 67 Vehicle.

Branding and PRM Compliance

The current livery of the combined fleet will be mixed and not instantly recognisable as TfWR operated trains. There are also issues with compliance of the Grand Central fleet with regards to PRM regulations.

In addition to this the LNER vehicles are vinyl wrapped and are already showing signs of aging with a dull appearance, blemishes and breaks in the vinyl.

To address the brand identity and PRM issues TfWR contracted DG8, a rail industrial design consultancy, to facilitate and produce concepts, designs and costings based upon the working groups requirements and compliance with industry standards.

The current re-branding exclude the Class 67 locomotive that is used to haul the Mk-4 Rolling Stock.

II.2.5) Award criteria

Price

II.2.11) Information about options

Options: No

II.2.13) Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: No

Section IV: Procedure

IV.1) Description

IV.1.1) Type of procedure

Open procedure

IV.1.8) Information about Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: Yes

IV.2) Administrative information

IV.2.1) Previous publication concerning this procedure

Notice number in the OJ S:

2022/S 000-026611

Section V: Award of contract

A contract/lot is awarded: No

V.1 Information on non-award

Section VI: Complementary information

VI.3) Additional information

See procurement documentation.

(WA Ref:133502)

VI.4) Procedures for review

VI.4.1) Review body

High Court

Royal Courts of Justice, The Strand

London

WC2A 2LL

UK

Telephone: +44 2079477501

VI.5) Date of dispatch of this notice

25/07/2023

Coding

Commodity categories

ID Title Parent category
71311230 Railway engineering services Civil engineering consultancy services

Delivery locations

ID Description
1017 Bridgend and Neath Port Talbot
1022 Cardiff and Vale of Glamorgan
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1013 Conwy and Denbighshire
1020 East Wales
1023 Flintshire and Wrexham
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)
1012 Gwynedd
1011 Isle of Anglesey
1021 Monmouthshire and Newport
1024 Powys
1014 South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion)
1018 Swansea
100 UK - All
1000 WALES
1010 West Wales and The Valleys

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
22 September 2022
Deadline date:
24 July 2023 00:00
Notice type:
05 Contract Notice (Utilities)
Authority name:
Transport for Wales Rail Limited (Utility Buyer)
Publication date:
12 October 2022
Notice type:
14 Corrigendum
Authority name:
Transport for Wales Rail Limited (Utility Buyer)
Publication date:
25 July 2023
Notice type:
06 Contract Award Notice (Utilities) - Incomplete Procedure
Authority name:
Transport for Wales Rail Limited (Utility Buyer)

About the buyer

Main contact:
paulmpeters@omniaprocurement.onmicrosoft.com
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.

0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.