Total quantity or scope of tender
In summary the project consists of the installation of gas metering, repair and refurbishment of the existing external gas pipework serving the Glamorgan Court residential blocks, Glamorgan Lodge, Accommodation
Office Block and Central Stores. As part of these works all existing gas supplies shall be fitted with new gas pressure regulators, gas meters with remote reading facility and meter kiosks.
In addition to the above works new water meters with pulsed remote reading facility shall be fitted to each block.
The Mountain halls, which consists of 5 multi occupancy residential units are currently fitted with existing gas and water meters with existing pulsed remote logging facility; therefore, no further works are required to the Mountain Halls.
The contractor shall allow for all required builders work items, access equipment etc to facilitate the works and pay attention to the site conditions which vary between locations.
Unless instructed otherwise, the installation shall be designed and delivered in accordance with the relevant British Standards and/or Codes of Practice.
The Contractor shall note that this Scope of Works Specification shall be read in conjunction with the following documentation:
+ TB+A Engineering Preliminaries
+ TB+A Mechanical Engineering Scope of Works Specification
+ TB+A Mechanical Engineering Workmanship Specification
The Mechanical Contractor shall be responsible for the design, supply and installation of all Mechanical,Electrical Engineering and Controls Services, as defined in the above information, into complete and suitable forms of installation.
The Mechanical Contractor shall carry out detailed surveys of the existing installations to fully ascertain the extent of existing installations and site conditions.
In general, this document is for the design, supply, and installation, testing and commissioning of the following building services systems:
+ Adjustments to existing gas pipework
+ New gas pressure regulators and sub-meters to be provided to each supply
+ New remote wireless pulsed meter logging to be linked back to the site network.
+ New gas kiosk inclusive of suitable base to be provided to gas supply
+ New water meters located upon entry to each block with wireless pulsed meter logging, linked back to the site network
+ Draining down and setting back to work the existing hot water system
+ Associated Builders work
+ Access equipment required to facilitate the required works
The Mechanical Contractor shall be responsible for developing the information detailed within this specification and indicated on the drawings into complete and suitable forms of installation.
For the purposes of the Tender the contractor shall complete associated M&E Summary of Tender outlining proposed costs for the various items of work and shall also provide indicative programme of works outlining phasing and overall works duration.
We envisage the works shall be able to be carried out during normal operational hours of 8am to 5pm Monday to Friday. However, contractor to advise within their programme of works any item which will require
significant service downtime and potential out of hours working. An associated schedule of rates for out of hour’s activity shall therefore be required.
The full scope of works is contained in the additional documents of this notice.
|