Total quantity or scope of tender
The University requires an electrically led design team to undertake, as a minimum, the following services:
• Electrical design
• Structural surveys and design information
• Preparation and submission of building regulations application (if required)
• Preparation and submission of planning application (if required)
• Development of tender documentation to appoint a contractor
• The role of a Principal Designer
• Estimating and Financial Services
• Quality inspections of the appointed contractors work
The Consultant will be expected to provide suitably qualified personnel to undertake the work and must provide a named single point of contact who shall be responsible for the operation of the contract. The multi-disciplinary team will comprise suitably qualified and/or experienced personnel who have wide and demonstrable experience in developments similar to this initiative. It is important to note that the University is interested in the experience of the individuals who will deliver the commission and not the collective experience of the company.
You will be required to develop drawings and specifications suitable to issue to a contractor for construction purposes and to represent the University from initial design through to completion of construction/ handover.
Please note that the University will act as Project Manager.
Your design is required to focus on the following requirements on the following buildings:
Treforest Campus
• LED lighting replacement to student accommodation buildings (Glamorgan Court and Mountain Halls), Treforest campus.
• Roof mounted solar PV systems on pitched and flat roofs to Glamorgan Court and Mountain Halls, Treforest Campus
• LED lighting replacement in Brecon building (B block), Treforest Campus
• Roof mounted solar PV systems on pitched and flat roofs of Brecon building (B block), Treforest Campus
Cardiff Campus
• LED lighting replacement to the Atrium building, Cardiff Campus
• Roof mounted solar PV systems on flat roof of the Atrium building (A Block), Cardiff Campus
Newport Campus
• LED lighting replacement to the Newport Campus
Sport Park Complex
• LED lighting replacement to the Sports Park building 1, Sports Park Complex
• Roof mounted solar PV system on flat roof at the Sports Park building 1, Sports Park Complex
• LED lighting replacement at the Sports Pavilion, Sports Park Complex
There is an accompanying folder with plans that are provided to inform your submission.
You are required to take the project through to completion, with the initial focus on producing suitably detailed tender issue drawings, and specifications, and subsequently resolution of any queries raised by the contractor.
Mechanical and Electrical Design
You should include for the following in your design and work schedule:
• All areas contained within the buildings listed above are to have new LED lighting complete with most suitable control function. This is also to include external lighting with the most suitable control function.
• Full surveys of general lighting are to be done to each building, as LED lighting exists in some areas, which does not require replacement.
• Full design and rationalisation of fitting ideally to reduce the number of lights in each building working to the minimum British Standard on lux levels for each area or activity.
• Our preferred suppliers are JCC, Tamlite and Dextra Lighting UK, where we receive 5 years on site parts and labour warranties and removal of all existing fittings free of charge. Designs will need to show lighting specifications and evidence of energy and carbon savings.
• Consideration needs to be given to splitting the existing switching to provide a greater degree of control.
• Option of a wireless system that can be upgraded to a monitored system, enabling an easy addition of additional switching
• An upgrade of emergency lighting in the buildings listed
• Full survey and design of all emergency lights
• All emergency light fittings to be stand alone and self-test as a minimum
• Emergency light fittings to be the same manufacturer as general lighting
Note – You are to allow for design and estimating of emergency lighting works only, we will not be proceeding with this element at this stage, but would like to have a package ready for future implementation
• Full structural roof surveys of all buildings listed that are expected to receive new PV panels
• Full PV designs for the buildings listed above and are should contain the following details:
• Full panel layouts - These will need to include the Kw of the panels proposed, panel and invertor model/specification
• Mounting system details
• General arrangement and connection details, avoiding penetrations to roofs wherever possible
• Any alterations and additions required to the existing lightning protection
• Details of electrical sub metering and the fitting of Stark data loggers. - It is advised that early engagement with Stark to ensure the correct type of meter and logger is identified.
• In addition to the above, you will be required to:
• Prepare and submit the G99 Application on the University’s behalf, and liaising with Western Power regarding any constraints to electrical supply capacity on the local networks at each campus
• Provide commissioning and witnessing certification on completion
• Provide relevant onsite training to selected USW staff
• Ensure the chosen contractor provides operation and maintenance manuals and as built drawings.
The quantity of key items (including light fittings) should be clear, rather than just denoting an area is to have a particular type of lighting.
You should ensure that spatial allowances for all electrical installations integrated into the buildings design are clearly identified including services routes, inspection and access areas.
Estimating and Financial services
Estimating and financial requirements are required as follows:
• The preparation of pre-tender budget estimates, including cost, carbon and kWh consumption savings likely to be achieved
• The preparation of the pre tender activity schedules to allow contractors to comparably price for the works
• Provide estimated operating and maintenance costs of all lighting and PV designs
• Review of contractors financial submissions
• Attend regular Project team meeting as required.
Principal Designer Services
Principal Designer requirements are a required as follows:
• Provide detailed Pre Construction Information for the works
• Submission of F10 (if required)
• Approve Contractors Construction Phase Plan
• Regularly monitor, maintain and present the Health and Safety File as required.
• Provide monthly visits to the site during the Construction Phase and provide client feedback.
• Carry out all duties in accordance with The Construction (Design and Management) Regulations 2015.
• Attend regular Project team meeting as required.
General
Coordination of all design services
Programme
In accordance with the requirements of the NEC4 Professional Services Contract, you are expected to provide a programme of your works. You should also develop a detailed information release schedule for co-ordination between the design disciplines, which should be made available to the client for transparency.
Client meetings
You should provide frequent design team meetings (at a minimum on a monthly basis at design stage) and should make these available to the client for attendance. You should allow for your lead consultant to attend progress meetings with the client on a monthly basis throughout the life of the project. Succinct progress reports should be provided for both design team meetings, and client progress meetings.
|