Contract Notice

Llansannan Flood Alleviation Scheme

  • First published: 05 July 2021
  • Last modified: 28 July 2021
  • Version: N/A
  • This file may not be fully accessible.

  •  

Information icon
You are viewing an expired notice.

Contents

Summary

OCID:
ocds-kuma6s-111970
Published by:
Conwy County Borough Council
Authority ID:
AA0389
Publication date:
05 July 2021
Deadline date:
10 August 2021
Notice type:
Contract Notice
Has documents:
Yes
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

The project involves the implementation of measures in the Afon Bach to provide flood alleviation and protect banks from erosion in the centre of the village of Llansannan. The project begins before you enter the village from the south where an existing 1200 diameter culvert passes under the A544. This culvert is to be replaced with an 1800mm dia culvert. Other works include but not limited to, construction of a new upstream headwall, installation of a precast downstream headwall including wing walls and stone scour protection to the river bed. The existing screen is to be removed and river bed to be re-graded. Moving downstream the river passes through the private garden of Dalar Bach. From where it emerges from the Maes Aled culvert to an existing footbridge in the garden, the banks and bed are to be improved and strengthened. Here the river bed is to receive a rock amour placed on a bed of smaller rocks on a non-woven geotextile membrane. The bed is to be stepped to take out the abruptness of the existing weir. The banks are to be reformed and strengthened with a “Rootlok Wall” as specified by Geogrow. There is also some removal of existing walls as necessary. And a number of existing trees are to be removed with compensatory planting outside of the proposed earthworks. Next the river passes a private car park and in front of a terrace of houses at Llain Hiraethog before entering into the 900mm diameter culvert that passes under the junction between the A544 and Ffordd Gogor. Adjacent to the car park a new reinforced concrete wall, clad with Penrhyn slate, is to be constructed to provide protection from flooding to the car park. The existing timber fence is to be removed and a new fence installed alongside the new flood wall. The access bridge to the car park is to be removed and the new access to be formed using a 2.1m wide 1.0m high precast box culvert. In front of Llain Hiraethog the existing south bank is to be retained. The northern bank is to be removed and the channel made wider and then replaced with a “Rootlok” retaining wall by Geogrow. The existing concrete river bed in this location is to be replaced with a new reinforced concrete bed. 100mm high alternating baffles at 3m centres assist fish travelling upstream by providing resting points. The existing pedestrian bridge is to be replaced with a 2.1m by 1m by 6m long precast box culvert which also provides a new communal area. Finally just before the junction with Ffordd Gogor the river goes into an existing 900 diameter pipe which goes across Ffordd Gogor and outfalls back into the river to the east. This is being replaced, and partly on a new line, by a new 2.1m x 0.8m box culvert. Where it ties back into the river at the downstream end of the scheme there is a new reinforced concrete outlet structure with masonry cladding. The Contractor must provide a suitable traffic and pedestrian management system that maintains public access to adjacent properties/businesses and their Clients at all times unless prior arrangement has been made and agreed with the Client. The contractor is responsible for organizing and arranging and carrying out all necessary temporary and permanent utility diversions necessary for the scheme, and coordinating the works by others

Full notice text

CONTRACT NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


Conwy County Borough Council

Environment Roads and Facilities , Bodlondeb, Bangor Road,

Conwy

LL32 8DU

UK

Kevin Lucas

+44 1492574000

kevin.lucas@conwy.gov.uk

http://www.conwy.gov.uk
www.sell2wales.gov.wales
www.sell2wales.gov.wales

1.2

Address from which documentation may be obtained


Conwy County Borough Council

Environment Roads and Facilities , Bodlondeb, Bangor Road,

Conwy

LL32 8DU

UK

Kevin Lucas

+44 1492574000

kevin.lucas@conwy.gov.uk

http://www.conwy.gov.uk

1.3

Completed documents must be returned to:


Conwy County Borough Council

Environment Roads & Facilities, Bodlondeb, Bangor Road,

Conwy

LL32 8DU

UK

Kevin Lucas

+44 1492574000

kevin.lucas@conwy.gov.uk

http://www.conwy.gov.uk

2 Contract Details

2.1

Title

Llansannan Flood Alleviation Scheme

2.2

Description of the goods or services required

The project involves the implementation of measures in the Afon Bach to provide flood alleviation and protect banks from erosion in the centre of the village of Llansannan.

The project begins before you enter the village from the south where an existing 1200 diameter culvert passes under the A544. This culvert is to be replaced with an 1800mm dia culvert. Other works include but not limited to, construction of a new upstream headwall, installation of a precast downstream headwall including wing walls and stone scour protection to the river bed. The existing screen is to be removed and river bed to be re-graded.

Moving downstream the river passes through the private garden of Dalar Bach. From where it emerges from the Maes Aled culvert to an existing footbridge in the garden, the banks and bed are to be improved and strengthened. Here the river bed is to receive a rock amour placed on a bed of smaller rocks on a non-woven geotextile membrane. The bed is to be stepped to take out the abruptness of the existing weir. The banks are to be reformed and strengthened with a “Rootlok Wall” as specified by Geogrow. There is also some removal of existing walls as necessary. And a number of existing trees are to be removed with compensatory planting outside of the proposed earthworks.

Next the river passes a private car park and in front of a terrace of houses at Llain Hiraethog before entering into the 900mm diameter culvert that passes under the junction between the A544 and Ffordd Gogor. Adjacent to the car park a new reinforced concrete wall, clad with Penrhyn slate, is to be constructed to provide protection from flooding to the car park. The existing timber fence is to be removed and a new fence installed alongside the new flood wall. The access bridge to the car park is to be removed and the new access to be formed using a 2.1m wide 1.0m high precast box culvert. In front of Llain Hiraethog the existing south bank is to be retained. The northern bank is to be removed and the channel made wider and then replaced with a “Rootlok” retaining wall by Geogrow. The existing concrete river bed in this location is to be replaced with a new reinforced concrete bed. 100mm high alternating baffles at 3m centres assist fish travelling upstream by providing resting points. The existing pedestrian bridge is to be replaced with a 2.1m by 1m by 6m long precast box culvert which also provides a new communal area.

Finally just before the junction with Ffordd Gogor the river goes into an existing 900 diameter pipe which goes across Ffordd Gogor and outfalls back into the river to the east. This is being replaced, and partly on a new line, by a new 2.1m x 0.8m box culvert. Where it ties back into the river at the downstream end of the scheme there is a new reinforced concrete outlet structure with masonry cladding.

The Contractor must provide a suitable traffic and pedestrian management system that maintains public access to adjacent properties/businesses and their Clients at all times unless prior arrangement has been made and agreed with the Client.

The contractor is responsible for organizing and arranging and carrying out all necessary temporary and permanent utility diversions necessary for the scheme, and coordinating the works by others

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=111970.

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.

Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.

2.3

Notice Coding and Classification

45000000 Construction work
1013 Conwy and Denbighshire

2.4

Total quantity or scope of tender

The works involve but are not limited to:-

a) Removal of existing culverts/pipes and installation of new culverts/pipes, including headwalls, wing walls, widening of existing streams and altering embankment profiles.

b) Removing existing headwalls and trash screen.

c) Coordinate with Statutory Authorities and manage service diversions (including any preparation works/reinstatement works as necessary)

d) Vegetation clearance

e) Temporary works (over pumping, dams etc)

f) Widening of existing watercourse channels and installing new bank support/protection.

g) Removal of existing sewers and manholes and re-lay in new locations.

h) Grouting of redundant culverts and pipes as specified

i) Construct flood walls

j) Reinstatement works

k) Tree and hedgerow mitigation and replacement planting

l) Accommodation works

m) Design and install traffic management

n) Obtain Ordinary Water Course Consent for Temporary works including payment of fees.

o) Requirements to work during Coronavirus covid-19 pandemic

3 Conditions for Participation

3.1

Minimum standards and qualification required

The contractor must have sufficiently qualified and experienced personnel to meet and be able to achieve the specified deadline.

4 Administrative Information

4.1

Type of Procedure

Single stage

4.2

Reference number attributed to the notice by the contracting authority

EP 10 C4

4.3

Time Limits

Time-limit for receipt of completed tenders
    06-08-2021  Time  17:00

Estimated award date
 26-08-2021

4.5

Language or languages in which tenders or requests to participate can be drawn up

EN  CY 

4.6

Tender Submission Postbox

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx

5 Other Information

5.1

Additional Information

(WA Ref:111970)

5.2

Additional Documentation

Volume 1 - EP 10 Maes Creiniog - Arfon Bach - FLood Alleviation Scheme - ITT - 1 7 21
Volume 2 - EP 10 C4 - Llansannan Flood Alleviation Scheme ( FAS) 1 7 21
Volume 3 - Llansannan Flood Alleviation Scheme- Scope and Site Info - 1 7 21
Volume 4 - Llansannan Flood Alleviation Scheme - Drawings and Bending Schedules 1 7 21
Llansannan FAS Tender Dwg Set
Volume 5 - Pre-Construction Information 1 7 21
Volume 5 Appendices
Bilingual Advert Sell2Wales Llansannan Flood Alleviation Scheme

5.3

Publication date of this notice

 05-07-2021

Coding

Commodity categories

ID Title Parent category
45000000 Construction work Construction and Real Estate

Delivery locations

ID Description
1013 Conwy and Denbighshire

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
05 July 2021
Deadline date:
10 August 2021 00:00
Notice type:
Contract Notice
Authority name:
Conwy County Borough Council
Publication date:
15 February 2023
Notice type:
Contract Award Notice
Authority name:
Conwy County Borough Council

About the buyer

Main contact:
kevin.lucas@conwy.gov.uk
Admin contact:
kevin.lucas@conwy.gov.uk
Technical contact:
N/a
Other contact:
kevin.lucas@conwy.gov.uk

Further information

Date Details
28/07/2021 08:12
Notice date(s) changed
The Deadline date was changed from 06/08/2021 17:00 to 10/08/2021 09:00.

We have received 2 requests saying due to being in the holiday season and staff are taking holidays.
28/07/2021 15:17
Question and Answers deadline change
The deadline for submission of questions through the online Q&A function has been changed as below.
Old question submission deadline: 30/07/2021 14:00
New question submission deadline: 02/08/2021 17:00
Please ensure that you have submitted all questions before the new date.
29/07/2021 11:52
ADDED FILE: Revised Drawing
Notes added to Drawing DR-0090 to highlight pipe diameter's on new highway drainage
29/07/2021 11:53
ADDED FILE: Revised Drawing
Notes added to Drawing DR-0091 to highlight pipe diameter's on new highway drainage
30/07/2021 11:25
ADDED FILE: Tender Addendum No. 1 - Overheads Cables
Tender Addendum No. 1 - Working under overhead cables.
30/07/2021 11:48
ADDED FILE: Tender Addendum No. 2 - Route of cable to Llain Hiraethog
Tender Addendum No. 2 - Route of existing power cable to Llain Hiraethog
03/12/2021 13:42
Tender Clarification No. 1. Inflation
Tender Clarification No. 1 – Inflation
The Council are aware of the current inflation pressures on plant, labour and material prices being experienced by contractors and are considering introducing “Option X1: Price adjustment for inflation” into the contract. A range of indices each with a weighting would be used to try to better reflect the real inflation on individual items. We would like to know if this would have any effect on your tender submission.
Could we have a response by close of play on Tuesday 7th December 2021 please?

Postbox

The awarding buyer has indicated that it will accept electronic responses to this notice via the Tender Submission Postbox facility.

Submit your tender response electronically in a secure environment.

To create an electronic response please click the "Add to my interest list" button at the top of the page.

For more information on the Postbox Facility please refer to the user guide:

Q&A

Ask the buyer any questions you may have relating to this notice. To ask the buyer a question or questions please click the "View Questions and Answers" button.

Additional documents

The following additional documents have been attached to this notice. To obtain these documents please select the individual file names below.

Current documents

docx
docx12.19 KB
This file may not be accessible.
docx
docx157.95 KB
This file may not be accessible.
zip
zip24.09 MB
This file may not be accessible.
docx
pdf
pdf465.69 KB
This file may not be accessible.
pdf
pdf468.50 KB
This file may not be accessible.
pdf
pdf475.97 KB
This file may not be accessible.
pdf
pdf331.09 KB
This file may not be accessible.
docx
docx97.77 KB
This file may not be accessible.

Replaced documents

There are no previous versions of these documents.


0800 222 9004

Lines are open 8:30am to 5pm Monday to Friday.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.