Total quantity or scope of tender
Summary of the Works
Pont Llanfihangel, Retaining Wall has been assessed as a sub-standard structure after failure of a section of wall. The drystone section of the retaining wall adjacent to the Grade II listed Pont Llanfihangel is to be replaced.
The project includes the following scope of works:-
- Demolition of the mortared masonry parapet
- Excavation and removal of carriageway
- Removal of highway drainage
- Excavation and removal of fill behind retaining wall
- Demolition of the drystone retaining wall
- Recovery of masonry from collapsed section of retaining wall
- Installation of highway and structure drainage
- Construction of mass fill concrete retaining wall
- Construction of mortared masonry facing to retaining wall
- Construction of mortared masonry parapet
- Reinstatement of carriageway and road markings
The works are classed as urgent works and the contractor shall provide a suitable programme that shows completion of the permanent works within the contract periods identified in Contract Data.
Full details of the works are contained in Volumes 1 – 4 of the tender documents.
|