Contract Award Notice

A55 DBFO Traffic Management Contract Phases 10 and 9

  • First published: 21 May 2018
  • Last modified: 21 May 2018
  • Version: N/A
  •  

  • This file may not be fully accessible.

  •  

Information icon

The buyer is not using this website to administer the notice.

To record your interest or obtain additional information or documents please find instructions within the Full Notice Text. (NOTE: Contract Award Notices and Prior Information Notices do not normally require a response)

Contents

Summary

OCID:
ocds-kuma6s-081253
Published by:
Cyngor Gwynedd
Authority ID:
AA0361
Publication date:
21 May 2018
Deadline date:
-
Notice type:
Contract Award Notice
Has documents:
No
Has SPD:
No
Has Carbon Reduction Plan:
N/A

Abstract

1 The objective of the tendering process is to procure a Traffic Management Contractor to provide Traffic Management function to the Main Contractor works for Gwynedd Civil Engineering. 2 The Traffic Management subcontractor shall provide the following Traffic Management criteria for the following phases; •A55 Anglesey Phase 10 Carriageway Major Maintenance Crossing point locations at Marker Post (MP) Reference 23/8, length of Crossover 96m to MP 23/8+96 MP Ref. 17/8 +64 length of Crossover 96m to MP 17/9+60 N.B. All the following Marker Post References are approximate to the nearest Marker Post Limits of carriageway maintenance works approx. 23/8 at Eastern end and 17/9 at Western end. Slip road closure requirements – Junction 6 Nant Turnpike West and Eastbound on and off slip roads Junction 6 W/B start of off slip at MP Ref. 23/7 end of on slip at MP Ref. 22/5 Junction 6 E/B start of off slip at MP Ref. 22/6 end of on slip at MP Ref. 23/6 Overhead power lines at two locations, between MP Ref. 23/6 and MP Ref. 23/7 between MP Ref.19/7 and MP Ref. 19/8 • A55 Anglesey Phase 9 Carriageway Major Maintenance Crossing point locations at Marker Post (MP) Reference 10/2, length of Crossover 96m to MP 10/2+96 MP Ref. 14/4+25 length of Crossover 96m to MP 14/5+21 N.B. All the following Marker Post References are approximate to the nearest Marker Post Limits of carriageway maintenance works approx. 10/2+50 at Eastern end and 14/5 at Western end. Slip road closure requirements – Junction 5 A4080 West and Eastbound on and off slip roads Junction 5 E/B start of off slip at MP Ref. 13/3 end of on slip at MP Ref. 14/2 Junction 5 W/B start of off slip at MP Ref. 14/2 end of on slip at MP Ref. 13/3 Overhead power line at one location, between MP Ref. 13/6 and 13/7 3 The proposed works will be carried out in accordance with the terms and conditions set out in the NEC4 engineering and construction short subcontract.

Full notice text

CONTRACT AWARD NOTICE – NATIONAL

WORKS

1 Authority Details

1.1

Authority Name and Address


Gwynedd Council

Gwynedd Civil Engineering, Parc Diwydiannol Mona,

Gwalchmai

LL65 4RJ

UK

Gareth Vaughan Roberts

+44 1407721296


www.gwynedd.gov.uk

2 Contract Details

2.1

Title

A55 DBFO Traffic Management Contract Phases 10 and 9

2.2

Description of the contract

1 The objective of the tendering process is to procure a Traffic Management Contractor to provide Traffic Management function to the Main Contractor works for Gwynedd Civil Engineering.

2 The Traffic Management subcontractor shall provide the following Traffic Management criteria for the following phases;

•A55 Anglesey Phase 10 Carriageway Major Maintenance

Crossing point locations at Marker Post (MP) Reference 23/8, length of Crossover 96m to MP 23/8+96

MP Ref. 17/8 +64 length of Crossover 96m to MP 17/9+60

N.B. All the following Marker Post References are approximate to the nearest Marker Post

Limits of carriageway maintenance works approx. 23/8 at Eastern end and 17/9 at Western end.

Slip road closure requirements – Junction 6 Nant Turnpike West and Eastbound on and off slip roads

Junction 6 W/B start of off slip at MP Ref. 23/7 end of on slip at MP Ref. 22/5

Junction 6 E/B start of off slip at MP Ref. 22/6 end of on slip at MP Ref. 23/6

Overhead power lines at two locations, between MP Ref. 23/6 and MP Ref. 23/7 between MP Ref.19/7 and MP Ref. 19/8

• A55 Anglesey Phase 9 Carriageway Major Maintenance

Crossing point locations at Marker Post (MP) Reference 10/2, length of Crossover 96m to MP 10/2+96

MP Ref. 14/4+25 length of Crossover 96m to MP 14/5+21

N.B. All the following Marker Post References are approximate to the nearest Marker Post

Limits of carriageway maintenance works approx. 10/2+50 at Eastern end and 14/5 at Western end.

Slip road closure requirements – Junction 5 A4080 West and Eastbound on and off slip roads

Junction 5 E/B start of off slip at MP Ref. 13/3 end of on slip at MP Ref. 14/2

Junction 5 W/B start of off slip at MP Ref. 14/2 end of on slip at MP Ref. 13/3

Overhead power line at one location, between MP Ref. 13/6 and 13/7

3 The proposed works will be carried out in accordance with the terms and conditions set out in the NEC4 engineering and construction short subcontract.

2.3

Notice Coding and Classification

45000000 Construction work
1011 Isle of Anglesey
1012 Gwynedd

2.4

Estimated Total Value

3 Procedure

3.1

Type of Procedure

Single stage

4 Award of Contract

4.1

Successful Bidders

4.1.1

Name and Address of successful supplier, contractor or service provider





Tarmac Trading Limited

9 The Village , Maisies Way,

South Normanton

DE55 2DS

UK




www.tarmac.com

5 Other Information

5.1

Reference number attributed to the notice by the contracting authority

6337

5.2

Date of Contract Award

 21-05-2018

5.3

Number of tenders received

3

5.4

Other Information

(WA Ref:82044)

5.5

Additional Documentation

N/a

5.6

Publication date of this notice:

 21-05-2018

Coding

Commodity categories

ID Title Parent category
45000000 Construction work Construction and Real Estate

Delivery locations

ID Description
1012 Gwynedd
1011 Isle of Anglesey

Alert region restrictions

The buyer has restricted the alert for this notice to suppliers based in the following regions.

ID Description
There are no alert restrictions for this notice.

Document family

Notice details
Publication date:
25 April 2018
Deadline date:
14 May 2018 00:00
Notice type:
Contract Notice
Authority name:
Cyngor Gwynedd
Publication date:
21 May 2018
Notice type:
Contract Award Notice
Authority name:
Cyngor Gwynedd

About the buyer

Main contact:
N/a
Admin contact:
N/a
Technical contact:
N/a
Other contact:
N/a

Further information

Date Details
No further information has been uploaded.